My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2008_5
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2008_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:28 PM
Creation date
7/3/2020 10:54:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2008_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2008_5.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Summary of Northern California Youth Center Sampling Results for December 13,2007 <br /> Forward Landfill-Austin Road Unit,California Page 2 <br /> chlorinates the water. The presence of bromoform,as shown on the attached table,in the indoor faucet <br /> ' sample and indoor faucet duplicate sample are assumed to be the result of the chlorination process. <br /> Forward Landfill and the NCYC continue to pursue extending municipal water to the NCYC facility. <br /> ' Forward Landfill reports that it is currently in the permitting phase of the project. The design work has <br /> been completed and the contractor bidding process is currently underway. Forward Landfill personnel <br /> have indicated that certain specifications of the project must be discussed with the City of Stockton and <br /> ' the NCYC before installation of the water supply line can begin. <br /> Sincerely, <br /> Herst&Associates,Inc. <br /> ' Ward Herst,PG,HG David Vasbinder <br /> Managing Director Staff Geologist <br /> ' California PG#7150 <br /> California HG#775 <br /> ' Cc: Ross Atkinson—RWQCB <br /> Robert McClellon—San Joaquin County LEA <br /> Reuben Ramirez—Forward Landfill <br /> ' Lochlin Caffey—Forward Landfill <br /> Attachment—December 2007 VOC Detection Table <br /> ' Laboratory Analytical Results <br />
The URL can be used to link to this page
Your browser does not support the video tag.