Laserfiche WebLink
APPENDEX A <br /> IMEIM=E]kFVLD ACITVrrM PROTOCOL , <br /> The Sampling and Analysis Plan (Kleinfclder, Novomberl, j994) dcscn'bcs haw o <br /> cMdMtS groundwater monitoring for ad, Inc, <br /> in&mUtion contained in the pla. <br /> supercedes sections related to sampling and analysis is the April 19$9 P <br /> n per'Addendum 1 and Addeo #1 ®f and ung methods andtas-dis d in thisappendix, infel Field A • ' ePjttocol <br /> arc at exert of the <br /> more comprehensive Sampling and AzWysis Plan. <br /> GR(jXJNDWATER MONITORING. <br /> Monitoring Wells <br /> Equipment <br /> The groundwater monitoring wells at Forward are equipped WI&dedicated <br /> Purging and collequon 8mm les. c el clan s merged Pimps for <br /> monitoring will have a list ofavailable <br /> g the i <br /> at.e p,., p{��pex�ipmeart that- d a le with.wlur„h to connplete-the <br /> 1 Onitodag- T e necessary egtnpmag rsi <br /> IISt includes actual used <br /> to purge and =epic the -wells in addition to <br /> Pr6tective gear that must be worn for <br /> protcction and to reduce the Potential for cr=cowzminadon of the wells and samples Sruue of <br /> the eqifipment used hwfudes various insm <br /> nnents wbich <br /> ration. Calibration- <br /> trres are below <br /> Calibration Procedures -- <br /> Of the Mete that are used in the field must be calibrated to produce refiabl' <br /> e resufts, 'The <br /> f0llowmg dums=cahlxaton rationale, . cy for the <br /> . eats. <br /> Water Levot Indicator - - - <br /> WSW Ic'vel indicators roust be calibrated iarly to a== that daft is not <br /> being Mewured <br /> itico <br /> y due to the cable strctching. To cah'bratc thewater level jadicator the cable is run out <br /> to .its entire lmgtb and measured against a tape nxwure. Ibc 0 point is the point asbe <br /> the.Pin <br /> "ch completes the Circuit when contwed by the water MIS completed circmt the <br /> 23-439494,0=101137B A-I <br /> 2WO .Ly July 14.2000 <br />