Laserfiche WebLink
Sampling Acid Analytical'protocol <br /> The follower � <br /> turdwater g protocols have been developed to increm <br /> ° the accuracy and compambiIi .of the <br /> monitoring data. The purposes of establishing and following. <br /> (i) to reduce sources of error that can be introduced during Samplingthe field protocols are <br /> and, �) to-collect <br /> in a consistent manner so that data sets Ids are`cam le. Therefore <br /> compazability .and ace include following the d '• project goals for <br /> '�� in this section to the <br /> Wgmt.possible. When field conditions necessitate a change from the established protocols, the <br /> necessary changes will be implemented with wain of <br /> coraparrbility as priorities. Any modification to, the P��. ��' and data set <br /> zvtocnl y Procedurns delineated.in <br /> P necessitated b field conditions and the -will ba noted On the:7"echrxiciazts <br /> Report(Ste Section 2.7)... Daily <br /> Depth To Mater Moments <br /> Depth to water measurements will be made in all the wells at the site <br /> prior to initiating plug <br /> and P . incl .wells that.are not to be sampled. Ile measurementswillbe made fo:r <br /> times a Year Prior to bidating each sampling mom, There are no <br /> d th to crater m P2e�ametc��t the site:- She- ..-- <br /> �' Measurements will be made Consecutively,inns short a time as possible,to <br /> Potential errors due to daily variations in the water table. <br /> -ta-water (IDTW) will be measured .in the well to within III()o of afoot using a <br /> corxductivitY-based water level indicator.' Measuremettts will be t*en the north or marked <br /> side of the top of of each YmIL These marks on tEie casings hate <br /> been Surveyed�`cY ` eta sea loved bya <br /> }' �' with the Ieve- l <br /> probe B inserted into the well through a*Vecial hole in the well cap., The cOnducdvity <br /> and <br /> cable wiI be m dei and m the <br /> and' - each <br /> •well. The samewaterlevel indicator will be used in each WeIL Depth to w-azer <br /> Jntasurcxg,ent will be recorded on a field observation shreet. <br /> Monitozing Well Purging Prior To <br /> Groundwater-Sam <br /> Fies will be collected frow CA<Mg morutotin8 wells at Forward Landfill Abu <br /> Purging the water_ ' g in the well, This water will be purged using either dedicated pumps <br /> or•a sp=W purge pump that is deco between each well. The follovag Procedure will <br /> be used to purge,the Water standing in the well,prior to sampling,the wells: _- <br /> 84940112310 A-6 JoJ* 14,200 <br /> ao da r� <br />