Laserfiche WebLink
DiSPOSM Of Pvtge Water <br /> 1 Only very low levels of either metallic or orpnic zontaaAaants have been detected in some of <br /> the wells dO,wnM&nt of WMU A. Bemuse these levels we very"low, there is not Sdffi <br /> dent <br /> n to CQnWnabe the Me water. Should the UWYdcal miults indicate a need to <br /> co follOvaing procedure viH be <br /> Sample purge water generated d ° g, and excess water generated during <br /> sampling, will be placed in a trafler mounted tank aftached to.the ling vehicle. <br /> When the tank is full,.thc grouridwaterwill bepuraped,.from the to an onsite leachate <br /> evaporation pond After the groundwater sampling round is completed tate tank wM be <br /> filled with appraxk=cly 1010 gallons of water from the water truck fill sts4on. This <br /> 'water will then be axed in the tank and pump to muse the systrm. The ririse water <br /> v-11 then be discharged to the lcwlmte_evaporation pend- <br /> Domestic Well - <br /> 7hc domestic well sampled (DW-9690) contdas.a-submcrsible pump with.:an iruline prCsstrre <br /> tank and switch to activate the pump,oncc"the drops below a certain valuate-The sample <br /> point for-DW--9694 was"a spigot dfiecdy attached to the prcssurctank. Waxer samples were not <br /> collected directly from the-well because the abo-vevvuad OumIrIng and submersible pumps - <br /> would need•to be removed. Prior to coUqcdng the wat=san3ples,the pump wasallowed to nm . <br /> for approldznAtely 30 mhurtes to purge the water rftt=anddraw vmmdwzw <br /> from-the aquifer.Ducing _ <br /> sampling, the pumps cycled on-off because the pumping raze mweeded the spigot <br /> dbcfiarSe. <br /> LAN <br /> DFELL GAS . <br /> Landfill Zas monitoring at Forward LandfM consists of monitoring gas in the teu huedm gas <br /> probes and m bundings located at the landfill <br /> -� 23.483$49-FOt123IOR325 A-1 t 7uty 14,2000 <br /> tae, <br />