My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2009_26
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2009_26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:35 PM
Creation date
7/3/2020 10:55:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2009_26
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2009_26.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Upper Northern Portion of WMU FU-08 September 2009 <br /> Forward Landfill Project No.021605.09 <br /> TABLE OF CONTENTS <br /> 1.0 INTRODUCTION.......................................................................................... 1 <br /> 2.0 PROJECT DESCRIPTION.......................................................................... 3 <br /> 2.1 Project Components of the Upper Northern Portion of WMU FU-08 ....3 <br /> 2.2 Project Construction Summary................................................................3 <br /> 2.3 Project Personnel......................................................................................4 <br /> 3.0 CONSTR UCTION QUALITY ASSURANCE PROGRAM.......................... 5 <br /> 3.1 Construction Components........................................................................5 <br /> 3.2 CQA Documentation.................................................................................5 <br /> 3.3 Design Modifications ................................................................................5 <br /> 3.4 Final Report..............................................................................................6 <br /> 4.0 MW FU-08 CONSTRUCTION.................................................................... 8 <br /> 4.1 Grading and Perimeter Berm...................................................................8 <br /> 4.2 Geomembrane...........................................................................................8 <br /> 4.2.1 Receiving Inspection......................................................................8 <br /> 4.2.2 Conformance Testing.....................................................................9 <br /> 4.2.3 Geomembrane Installation..........................................................10 <br /> 4.2.3.1 Geomembrane Deployment............................................10 <br /> 4.2.3.2 Field Seaming.................................................................11 <br /> 4.2.4 Defects and Repair.......................................................................14 <br /> 4.3 Geotextile Installation............................................................................15 <br /> 4.4 Geogrid....................................................................................................16 <br /> 4.4.1 General.........................................................................................16 <br /> 4.4.2 Receiving Inspection....................................................................16 <br /> 4.4.3 Deployment ..................................................................................16 <br /> 4.5 LCRS Granular Material .......................................................................17 <br /> 4.6 LCRS Pipe and Tanks ............................................................................21 <br /> 4.7 Protective Operations Soil......................................................................22 <br /> 5.0 CONCLUSION............................................................................................. 23 <br /> Vector Engineering, Inc.- 143E Spring Hill Drive•Grass Valley,CA 95945•(530)272-2448 <br /> -i- <br />
The URL can be used to link to this page
Your browser does not support the video tag.