My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2009_26
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2009_26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:35 PM
Creation date
7/3/2020 10:55:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2009_26
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2009_26.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Upper Northern Portion of WMU FU-08 September 2009 <br /> Forward Landfill Project No.021605.09 <br /> 1.0 INTRODUCTION <br /> This report summarizes the construction quality assurance (CQA) observations and <br /> activities performed by Vector Engineering, Inc. (Vector) for Forward, Inc. <br /> (Forward), during the construction of the upper northern portion of WMU FU-08 <br /> liner system at the Forward Landfall. The upper northern portion of WMU FU-08 <br /> overlies the interim final cover for the existing Austin Road Landfill. This interim <br /> final cover will serve as the base liner component for the northern portion of WMU <br /> FU-08. The interim final cover was completed and approved in November 2002. <br /> The construction of the upper northern portion of WMU FU-08 was subsequent to <br /> the construction of the lower floor portion of WMU FU-08 that was completed last <br /> year. This CQA report summarizes the completion of the upper northern portion of <br /> WMU FU-08. The CQA report for the lower floor portion of WMU FU-08 as <br /> submitted at the completion of construction last year. <br /> CQA activities included monitoring earthworks construction, geosynthetics <br /> installation, and collection piping installation. This final report contains detailed <br /> documentation that the construction and CQA activities associated with the <br /> northern portion of WMU FU-08, were constructed in accordance with approved <br /> clarifications and modifications thereto, as well as in general accordance with the <br /> following documents: <br /> • Title 27 of the California Code of Regulations; <br /> • Construction Drawings, WMU U-08, Forward Landfill, Lewis <br /> Engineering, April 2009, <br /> • Technical Specifications, WMU FU-08, Forward Landfill, Lewis <br /> Engineering, April 2009, and <br /> • Construction Quality Assurance Manual WMU FU-08, Forward <br /> Landfill, Lewis Engineering, April 2009. <br /> Vector Engineering, Inc.• 143E Spring Hill Drive•Grass Valley, CA 95945•(530)272-2448 <br /> -1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.