Laserfiche WebLink
1.0 Surface Water Monitoring <br /> During the third quarter 2010 monitoring event, surface water monitoring was performed at the <br /> Austin Road Landfill by Del-Tech Geotechnical Support Services, Inc. (Del-Tech). Littlejohns <br /> Creek was sampled at upstream(background)monitoring point ASW-1. Downstream monitoring <br /> point ASW-2 was reportedly dry. Surface water samples are scheduled to be analyzed quarterly <br /> for field parameters (pH, specific conductance, temperature, and turbidity) and monitoring <br /> parameters (bicarbonate, calcium, carbonate, chemical oxygen demand [COD], chloride, <br /> magnesium, nitrate, oil and grease,potassium, sodium, sulfate, total dissolved solids [TDS], total <br /> organic carbon [TOC], and volatile organic compounds [VOCs])when surface water is present. <br /> The field results provided by Del-Tech and laboratory results provided by TestAmerica Buffalo. <br /> (TestAmerica) for the third quarter 2010 surface water monitoring event are summarized on <br /> Table 2.1. The historical surface water data are presented in Appendix A. Times series <br /> concentration plots of historical surface water data are presented in Appendix B. <br /> Historical data from the surface water monitoring points were evaluated for temporal trends using <br /> Mann-Kendall / Sen's Slope trend analysis. Graphs and summary table of the Mann-Kendall / <br /> Sen's Slope analyses for surface water monitoring points are presented in Appendix B. There <br /> were no constituents that exhibited a statistically significant upward trend. Mann-Kendall/ Sen's <br /> Slope analysis identified decreasing trends in calcium at ASW-1, chemical oxygen demand at <br /> ASW-1, chloride at ASW-1, nitrate at ASW-1 and ASW-2, field specific conductance at ASW-1 <br /> and ASW-2, sulfate at ASW-1 and ASW-2,TDS at ASW-1 and ASW-2, and TOC at ASW-1 and <br /> ASW-2. <br /> Site personnel reported that soil cover has been placed over the waste material to prevent ponding <br /> of stormwater and to protect surface water. In addition, down drains and a perimeter ditch direct <br /> stormwater to a basin in the southwest corner of the site. Inspection and maintenance procedures <br /> for these stormwater control structures are provided in the site's Stormwater Pollution Prevention <br /> Plan,prepared by C112M Hill and revised June 1997. <br /> 2.0 Groundwater Monitoring <br /> During the third quarter 2010 monitoring event, groundwater detection monitoring and corrective <br /> action monitoring were performed at the Austin Road Landfill by Del-Tech. Monitoring well <br /> AMW-2, which is upgradient from the landfill, is the designated background well. Monitoring <br /> wells AMW-6, AMW-7, AMW-12, AMW-13, and AMW-14 are currently designated as <br /> detection monitoring wells. Monitoring wells AMW-1,AMW-3, AMW-4, AMW-5R, AMW-10, <br /> AMW-11, AMW-18, AMW-19, and AMW-19BR are designated as corrective action monitoring <br /> wells. Del-Tech has reported that corrective action monitoring well AMW-3 has been <br /> abandoned. Corrective action monitoring well AMW-5R is a replacement for corrective action <br /> monitoring well AMW-5. Corrective action monitoring well AMW-19BR is a replacement for <br /> corrective action monitoring well AMW-19B. The analytical results from samples collected at <br /> the corrective action wells are used to evaluate improvements in groundwater quality as a result <br /> of previously implemented corrective action measures. <br /> Groundwater samples are scheduled to be analyzed quarterly for field parameters (groundwater <br /> elevation, pH, specific conductance, temperature, and turbidity) and monitoring parameters <br /> (arsenic, barium, bicarbonate, calcium, carbonate, chloride, gasoline-range petroleum <br /> hydrocarbons, hexavalent chromium, magnesium, nitrate, oil and grease, potassium, sodium, <br /> strontium, sulfate,TDS, and VOCs). <br /> 1 <br />