My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010_14
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2010_14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 12:56:45 AM
Creation date
7/3/2020 10:55:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010_14
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2010_14.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
415
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 5 <br /> Containment System <br /> The WMU FU-10 containment system consists of a liner and LCRS on the base of the unit and a <br /> composite side slope liner on the northern excavation slope. The northern slope also incorporates an <br /> interface liner to separate Class III wastes in the former Austin Road Landfill from the overlying <br /> Class Il wastes to be placed in WMU FU-10. <br /> The northern boundary of WMU FU-10 will connect to the southern limit of WMU FU-08 North <br /> where the two modules intersect. The liners and LCRS in the top deck area directly north of WMU <br /> FU-10 will be connected and the leachate from this top deck area will drain to the sumps on the <br /> WMU FU-10 base. <br /> The area where WMU FU-10 and WMU FU-08 North will be connected is a relatively flat area. The <br /> portion of the existing WMU FU-08 North southern termination berm located at the intersection with <br /> WMU FU-10 will be removed. The clay liner in WMU FU-08 North will be transitioned to a 60-mil <br /> HDPE geomembrane and extended to meet the geomembrane liner in WMU FU-10. The gravel layer <br /> in WMU FU-08 North will be extended to connect to the geocomposite drainage net at the top of the <br /> WMU FU-10 northern slope. Leachate from the portion of WMU FU-08 North that intersects WMU <br /> FU-10 can then flow directly into the WMU FU-10 sumps. Because the connection area is relatively <br /> flat and is underlain by refuse in the former Austin Road Landfill, a geogrid is incorporated in the <br /> connection area to support the overlying liners and LCRS systems. <br /> The base liner system for WNW FU-10 consists of the following,from bottom to top: <br /> • Prepared subgrade; <br /> • Minimum 2-foot thick compacted clay liner with a maximum field hydraulic conductivity of 1 x <br /> 10-7 cm/sec; <br /> • 60-mil,double-sided textured HDPE geomembrane liner; <br /> • Cushion geotextile; <br /> • One-foot thick blanket gravel and pipe network drainage layer with a minimum hydraulic <br /> conductivity of 0.1 cm/sec; <br /> • Nonwoven geotextile filter fabric; <br /> • One-foot thick protective operations layer <br /> The north side slope and the interface liner system consists of,from bottom to top: <br /> • Prepared subgrade (for excavated slopes) or approximately 4-ft thick foundation layer (for <br /> interface liner); <br /> • Needlepunched reinforced geosynthetic clay liner(GCL); <br /> WMU FU-10 REPORT6 5-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.