Laserfiche WebLink
SECTION 6 <br /> Summary <br /> This report presents the construction documents and supporting design criteria required for <br /> completion of WMU FU-10 at the Forward Landfill. Design calculations have been performed and <br /> construction documents prepared to demonstrate that the design of this unit complies with Forward's <br /> WDRs,and Title 27 requirements. <br /> These Design and Construction Documents have been prepared under the supervision of Sangeeta P. <br /> Lewis,whose seal as a Registered Professional Engineer in the State of California is affixed below. <br /> PpAS9a��lr <br /> V` <br /> No. C47735 <br /> 11"2 <br /> I l- <br /> SANGEETA P.LEWIS RCE 47735 <br /> ��o► CM-W <br /> WMU FU-10 REPORT 6-1 <br />