Laserfiche WebLink
Contents <br /> Section Page <br /> 1 Introduction.......................................................................................................................... 1-1 <br /> 2 Base and Final Grading.......................................................................................................2-1 <br /> 2.1 General..............................................................................................................................2-1 <br /> 2.2 Liner and LCRS Grades....................................................................................................2-1 <br /> 2.3 Supported Lining Systems................................................................................................2-2 <br /> 2.3.1 Analytical Method..........................................................................................2-2 <br /> 2.3.2 Supported Lining System for Slopes Steeper than 6:1 ...................................2-3 <br /> 2.3.3 Supported Lining System for Slopes Flatter than 6:1.....................................2-3 <br /> 2.4 Refuse Fill Grades............................................................................................................2-4 <br /> 3 Slope Stability.......................................................................................................................3-1 <br /> 3.1 Seismic Hazard Analysis..................................................................................................3-2 <br /> 3.2 Analytical Method............................................................................................................3-3 <br /> 3.3 Stability Analysis..............................................................................................................3-4 <br /> 3.3.1 Material Properties..........................................................................................3-4 <br /> 3.3.2 Results of Slope Stability Analyses................................................................3-5 <br /> 4 Surface Drainage.................................................................................................................4-1 <br /> 5 Containment System............................................................................................................5-1 <br /> 5.1 Lining System...................................................................................... <br /> 5.1.1 Clay Liner.......................................................................................................5-2 <br /> 5.1.2 Geosynthetic Clay Liner.................................................................................5-3 <br /> 5.1.3 HDPE Geomembrane............................................................ ...5-3 <br /> 5.2 Leachate Collection and Removal System(LCRS)...................................................5-3 <br /> 5.2.1 Slope LCRS....................................................................................................5-4 <br /> 5.2.2 Base LCRS......................................................................................................5-4 <br /> 5.3 Protective Operations Layer......................................................................................5-5 <br /> 6 Summary..............................................................................................................................6-1 <br /> 7 References.............................................................................................................................7-1 <br /> Appendices <br /> Appendix A. Construction Drawings <br /> Appendix B. Design Calculations <br /> Appendix C. Specifications <br /> Appendix D. Construction Quality Assurance(CQA)Manual <br /> WMU FU-10 <br />