DEL-TECH GEOTECHNICAL SUPPORT SERVICES,INC. <br /> (209)847.8757(OFFICE)•(209)847-3700(FAX)•deltech l@pacbe0.mt(Email) <br /> SITE: FORWARD LANDFILL/MANTECA,CA. <br /> GROUNDWATER TREATMENT SYSTEM MONITORING LOG 2010 <br /> HOURLY DOWNTIME LOG <br /> TOWER PUMPING <br /> OPERATION SYSTEM TIME TIME <br /> DATE STATUS NAME OFFLINE ONLINE ACTIONS/REASON FOR DOWNTIME <br /> January 12,2010 ALL WELLS <br /> January 26,2010 ALL WELLS <br /> February 8,2010 ALL WELLS <br /> February 28,2010 ALL WELLS <br /> March 12,2010 ALL WELLS <br /> March 30,2010 ALL WELLS <br /> April 9,2010 _ ALL WELLS <br /> April 20,2610 0 EW-3R&EW-4 ???? MAIN POWER LOSS/RESET BREAKER/WORKING ENE NOW <br /> April 20,2010 ON ti ALL WELLS <br /> May 14,2010 ON LI ALL WELLS <br /> Ma 27,2010 ON LI ALL WELLS <br /> Juoe 8,1010 ON LIN ALL WELLS <br /> June 22,2010 ON LI ALL WELLS <br /> July 7,2016 OFF L EW-3R 999MAIN POWER LOSS/RESET BREAKER <br /> Jul 29,2010 OFF LI EW-3R ??? PUMP MOTOR HAS FAILED/PUMP RIG SCHEDULED <br /> August 13,2010 ON LIN EW-3R ??? <br /> REPLACED PUMP MOTOR/CLEANED PUMP/ON-LME NOW <br /> August 30,2010 ON LIN ALL WELLS <br /> Se[ember 1$,2610 0 - TOWER/EW-3R NEW PUMP MOTOR IN 3R/TOWER CLEANING <br /> Se[ember 30,2010 ALL WELLS&TOWER <br /> October 13,2011 ALL WELLS&TOWER <br /> October 26,2011 O TOWER REPAIRS FULLY CONJESTED WITH CALCIUM/NAW FLOW/MGH SUMP ALARMS <br /> November 9,2011 0 TOWER DOWN TOWER NEEM MAJOR REPAIRS/CLEANING/NEW PACKING <br /> November 24,2011 0 TOWER EFFLUENT LINE DOWN EFFLEUNT LME NOW NEEDS TO HE REPLACED-600 FT.OF r PVC <br /> December 10,2011 TOWER UP/WELLS 1,2,4 UP EX.3R IS DOWN/MOTOR FAILURE AGAIN <br /> December 27,2011 TOWER UP/WELLS 1,2,4 UP EX.3R IS DOWN/MOTOR FAILURE AGAIN <br /> PRIOR TO OCT.26TH MULTIPLE HIGH SUMP ALARMS WERE BEING CLEARED.ALSO THE AIR PRESSURE FOR THE TOWER HAS GONE UP TO 40"OF WATER PRESSURE. <br /> OPENED INSPECTION PLATE ON TOWER AND DISCOVERED THAT THE UNIT WAS FULLY CALCIFIED OVER.MINIMAL AIR FLOW WAS FLOW UP AND THROUGH THE TOWER. <br /> OCT.28TH-RETURNED TO SITE AND CYCLED 100 GALLONS OF HYDROCLORIC ACID THROUGH TOWER FOR 72 HOURS.UPON INSPECTING THE SUMP AND LOWER UNIT THE <br /> TOWER WAS CLEAN AND FREE OF ANY CALCIUM BUILDUP.STARTED UP SYSTEM AGAIN AND STILL WE HAD HIGH PRESSURE. <br /> REMOVED THE UPPER TOWER INSPECTION COVER TO DISCOVER THAT THE TOWER WAS CLOGGED UP FROM THE BOTTOM ALL THE WAY UP TO THE TOP. <br /> THE TOWER NEEDED TO BE FULLY DISASSEMBLED AND REMOVED FOR SERIOUS CLEANING.ALL NEW PACKING MATERIAL WAS ORDERED AND A TRETROFIT TO RAISE THE <br /> BASE OF THE TOWER FOUR FEET WAS ENGINEERED.THE GRAVITY FLOW FROM THE TOWER TO THE EFFLUENT POND WAS NOT ENOUGH FOR PROPER FLOW. <br /> SCHEDULED CRANE AND PARTS FOR TOWER TEARDOWN AND REBUILDING.THIS TURNED INTO A MAJOR UNDERTAKING DUE TO THE TONS OF CALCIUM INSIDE OF TOWER. <br /> BETWEEN EXTREME WEATHER CONDITIONS AND A VERY DIFFICULT TASK.TOWER REINSALLED 1129/10.ALL SYSTEMS RUNNING GOOD FOR A SHORT TIME.MORE <br /> HIGH SUMP ALARMS.DISCOVERED THAT NOW THAT THE TOWER IS OPERATING A PEAK PERFORMANCE THE 8 INCH EFFLUENT LINE WAS ALSO HEAVILY CLOGGED WITH <br /> CALCIUM.THIS NEW UNKNOWN CONDITION NOW REQUIRES THE REMOVAL AND REPLACEMENT OF APPROX.600 FEET OF PVC EFFLUENT LINE. <br /> DEC.02 2010-THE TOWER&NEW EFFLUENT LINE WERE PUT BACK ON-LINE.THE FULLYSYSTEM IS RUNNING AT PEAK PERFORMANCE. <br /> EX.3R IS STILL DOWN DUE TO A FAILED PUMP MOTOR.DUE TO THE VERY HEAVY RAINFALL IT HAS BEEN IMPPOSIBLE TO GET A PUMP RIG OUT TO CHANGE THE PUMP MOTO <br /> WAITING FOR THE WEATHER TO CLEAR AND NOT GET STUCK.ALSO THE EFFLUENT LINE FROM 3R IS SCHEDULED TO BE UPGRADED TO A 6"LINE AS SOON AS THE SITE <br /> CONDITIONS UPGRADE.THIS WILL GREATLY REDUCE THE BACKPRESSURE THAT 3R HAS BEEN EXPERIENCING IN THE PAST.WE ESTIMATE IN THE SPRING OF 2011 FOR THIS. <br />