My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010_18
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2010_18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 9:39:34 PM
Creation date
7/3/2020 10:55:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010_18
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2010_18.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sampling was conducted on June 8, 2010 and completed over an eight hour sampling <br /> period. During the sampling period, Del-Tech personnel visually checked the sampling <br /> pumps on an hourly basis for fluctuations in the flow rate and corrected and recorded any <br /> deviations of more than 5 percent from the initial value. After sampling was completed, <br /> each pump was re-calibrated to determine the post-test value. The pretest and post-test <br /> values were averaged over the total sample time to calculate an average value that was <br /> used to calculate a total volume for each sample cassette. <br /> After sampling, the sample cassettes were removed from the sample pumps and labeled, <br /> packaged, sealed, and stored in a secure location. The following day, all samples were <br /> shipped to ATEML for analysis. A completed chain-of-custody from, detailing the <br /> sample I.D. numbers, date and time collected, analysis requested, and other project <br /> information accompanied the samples to the laboratory. Each sample was analyzed for <br /> asbestos by NIOSH Method 7402 (Revision#1) using transmission electron microscopy. <br /> MONITORING RESULTS <br /> Field monitoring of meteorological data was recorded electronically at the Forward <br /> Landfill weather station. During the sampling event on June 8, 2010, the average <br /> temperature was 78 degrees with a high of 84 degrees and a low of 69 degrees. The <br /> average wind speed was 10 miles per hour out of the northwest and the average relative <br /> humidity was 35%. <br /> The analytical results reported by ATEML for the asbestos samples are summarized in <br /> the table below. As shown in the table below, asbestos was not detected at any of the <br /> sample locations. <br /> Summary of Asbestos Concentrations <br /> Forward Landfill <br /> Sample Average Flow Sample Asbestos Asbestos <br /> Station Rate Volume Concentration Concentration <br /> (Liters min) (Liters) (Fibers/cm3 Air) (AgAdM3 Air) <br /> A 1.8 864 <0.0011 <0.00103 <br /> B 2.3 1104 <0.0009 <0.000842 <br /> C 1 1.5 720 <0.0014 1 <0.00131 <br /> D 1.7 816 <0.0012 <0.00112 <br /> E 1.7 816 <0.0011 <0.00103 <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.