C.Recycle
<br /> Disposal Facility inspection Report (52)
<br /> liforgerr�srlf Agency County of San Joaquin
<br /> �s7=r 2 .: •__. 5}e r..•
<br /> SW►Ss�aai€i#y Fsife_j�ie[rrea [t99 i 9��$} `�,�-'F E speel€on'Rate ri a
<br /> i 39-AR-0015 14/1912010 LEA Periodic
<br /> 1 irnir in c
<br /> 5:30 AM �1me�ou f igspe �1 ?it
<br /> F?rCil�fY:t't1�et.c�����`-_ fir,F: .=rs tee"-.,�'-:�^Y€".�.L'� _ �.�d �`':}Eer�ejv��t•Bi .;,-=.�''.� ,'--',L,-'�.`
<br /> Forward, Mc 1AII€ed Waste North America
<br /> Forward Landfill,Inc _ —
<br /> C _
<br /> 9999 S.Austin Road,Manteca 95336
<br /> C C
<br /> �.
<br /> ins,S,P®lo _brz•,C rb y,ci?£Y4Eta ic4. ^as, ::i $x_.
<br /> Michael Kith Ruben Ramirez,Landfill Manager
<br /> TFL^wSOVE fAGlFY WAS PiSF`Ef.TEO EGR C6YR4.YCEYAM M?UGl9?Hb£CNF90f T1�0.'V40.Y SJOE iME P4PYJGAE9011RCES GOOEiPRGIM9 TFME A\9 MSE 2TWOGRNACODE @REG'A MM tC ) t
<br /> p� da° s' �. r{'e.t� - t-- _ F ter`s. •g,- R
<br /> Ep�t!
<br /> E
<br /> F.V f. �A B;Y,1'i�!1�$� ,r �R f.•�j.'jf' Et d.�.i y'-�- ..S,-,�
<br /> 7 a
<br /> 20921 -das Monitoring and Control
<br /> Comments:The EHD staff used the Lantec Gem 2000 to measure the concentration of explosive gas at the
<br /> property boundaries.The concentrations of methane gas by volume in SG-11 were 41%in Shallow,36.5%in
<br /> Intermediate and 26.4%in Deep.The concentration of methane gas in SG-9,SG-10 and SG-12 were 0%by
<br /> volume.
<br /> 1.Ensure that the concentration of the explosive gas is less than 5%by volume.
<br /> 2.Within 60 days of dectection(June 3,2010), implement a remediation plan that has been approved by the
<br /> EHD and the CalRecycle(formerly CIWMB).
<br /> 3.The concentration of explosive gas at the property boundary has exeeded 5%by volume every month since
<br /> May,2010.
<br /> 4.On September 28,2010, CalRecycle had notified the operator that this facility had been Included on the
<br /> Inventory of Solid Waste Facilities Which Violate State Minimum Standard for the violation of the gas monitoring
<br /> and control standard.
<br /> 5.On October 14,2010,the EHD had issued Notice and Order 2010-01,Compliance Schedule For Forward
<br /> Landfill, to the operator.
<br /> 6. The contractor Is installing new gas extraction wells as described in the 2010 Gas System Improvement
<br /> October 2010. The installation of Soil Vapor Extraction(SVE)wells will begin December 1,2010,according to
<br /> the contractor. The SVE wells shall not be installed without EHD oversight. The operator or contractor shall
<br /> contact EHD prior to installing SVE wells
<br /> .. F.�, -
<br /> ip�p@oon Report`Correserlts_ :-,.. ..._ .t_. , _._._.• .
<br /> Notes:
<br /> 1. Notice and Order 2010-01,Compliance Schedule,was issued on October 14,2010.
<br /> 2.'According to the operator,tarps were used as ADC about 2 weeks.
<br /> 3.At time of Inspection,tarps,TASW and soil were used for cover.
<br /> 4.At time of inspection,the contractor were installing gas extraction wells in the lined units.
<br /> 5.The operator employs falconeer to control bird issues. The falconeer is on site from September 27,2010 to April 10,
<br /> 2011.
<br /> 6.According to the operator, module FU 010 began receiveing waste on Monday,November 15,2010.
<br /> I
<br />
|