Laserfiche WebLink
C.Recycle <br /> Disposal Facility inspection Report (52) <br /> liforgerr�srlf Agency County of San Joaquin <br /> �s7=r 2 .: •__. 5}e r..• <br /> SW►Ss�aai€i#y Fsife_j�ie[rrea [t99 i 9��$} `�,�-'F E speel€on'Rate ri a <br /> i 39-AR-0015 14/1912010 LEA Periodic <br /> 1 irnir in c <br /> 5:30 AM �1me�ou f igspe �1 ?it <br /> F?rCil�fY:t't1�et.c�����`-_ fir,F: .=rs tee"-.,�'-:�^Y€".�.L'� _ �.�d �`':}Eer�ejv��t•Bi .;,-=.�''.� ,'--',L,-'�.` <br /> Forward, Mc 1AII€ed Waste North America <br /> Forward Landfill,Inc _ — <br /> C _ <br /> 9999 S.Austin Road,Manteca 95336 <br /> C C <br /> �. <br /> ins,S,P®lo _brz•,C rb y,ci?£Y4Eta ic4. ^as, ::i $x_. <br /> Michael Kith Ruben Ramirez,Landfill Manager <br /> TFL^wSOVE fAGlFY WAS PiSF`Ef.TEO EGR C6YR4.YCEYAM M?UGl9?Hb£CNF90f T1�0.'V40.Y SJOE iME P4PYJGAE9011RCES GOOEiPRGIM9 TFME A\9 MSE 2TWOGRNACODE @REG'A MM tC ) t <br /> p� da° s' �. r{'e.t� - t-- _ F ter`s. •g,- R <br /> Ep�t! <br /> E <br /> F.V f. �A B;Y,1'i�!1�$� ,r �R f.•�j.'jf' Et d.�.i y'-�- ..S,-,� <br /> 7 a <br /> 20921 -das Monitoring and Control <br /> Comments:The EHD staff used the Lantec Gem 2000 to measure the concentration of explosive gas at the <br /> property boundaries.The concentrations of methane gas by volume in SG-11 were 41%in Shallow,36.5%in <br /> Intermediate and 26.4%in Deep.The concentration of methane gas in SG-9,SG-10 and SG-12 were 0%by <br /> volume. <br /> 1.Ensure that the concentration of the explosive gas is less than 5%by volume. <br /> 2.Within 60 days of dectection(June 3,2010), implement a remediation plan that has been approved by the <br /> EHD and the CalRecycle(formerly CIWMB). <br /> 3.The concentration of explosive gas at the property boundary has exeeded 5%by volume every month since <br /> May,2010. <br /> 4.On September 28,2010, CalRecycle had notified the operator that this facility had been Included on the <br /> Inventory of Solid Waste Facilities Which Violate State Minimum Standard for the violation of the gas monitoring <br /> and control standard. <br /> 5.On October 14,2010,the EHD had issued Notice and Order 2010-01,Compliance Schedule For Forward <br /> Landfill, to the operator. <br /> 6. The contractor Is installing new gas extraction wells as described in the 2010 Gas System Improvement <br /> October 2010. The installation of Soil Vapor Extraction(SVE)wells will begin December 1,2010,according to <br /> the contractor. The SVE wells shall not be installed without EHD oversight. The operator or contractor shall <br /> contact EHD prior to installing SVE wells <br /> .. F.�, - <br /> ip�p@oon Report`Correserlts_ :-,.. ..._ .t_. , _._._.• . <br /> Notes: <br /> 1. Notice and Order 2010-01,Compliance Schedule,was issued on October 14,2010. <br /> 2.'According to the operator,tarps were used as ADC about 2 weeks. <br /> 3.At time of Inspection,tarps,TASW and soil were used for cover. <br /> 4.At time of inspection,the contractor were installing gas extraction wells in the lined units. <br /> 5.The operator employs falconeer to control bird issues. The falconeer is on site from September 27,2010 to April 10, <br /> 2011. <br /> 6.According to the operator, module FU 010 began receiveing waste on Monday,November 15,2010. <br /> I <br />