Laserfiche WebLink
1. Thd pH, conduct.ivity, and turbidity 'meters will be calibrated at a minimum at the <br />beg'nag of each sampling day using comm"afly obtained standards- Calibration, will <br />R e checked two to thrm times during the daytoevaluate the potential that the callbrafion <br />is drifting throughout the day. - If instrument dxift a is the ficjd, the <br />raeasurernc= iaken during pm -ging ind sampling will b4 i4justed accordingly. Example <br />calibration logs are included in Apriendix*C. Dtiring purginga�nd sampr;ng of the wells <br />the instruments will be used in the same manner as driting calibration. <br />2. Depth to water wUl be measured <br />again, Prior to =Wft. ia each well as d��bed in <br />Section 4.4.1 and recorded on the Purge fir. .aa t.cranio n, and Sample Log. The -volume <br />of groundwater in the well casing will be calcuLated using the Bollowing equation(s): <br />44i7ch well-- 'Well Depth fiorr. the mark on the well casing (ft)'- DTW (ft)) x <br />0-653 gaVfL <br />Prioi to pur&g, the- vrater, wiM be7-exadiimed-by- using -a di�posable-baflcr that is clear - <br />enough to see ffirougfi. Features such as iziimiscible lay= will be noted and -measure& <br />immiscible layers arcobserved the -wa will not be purged prior to samplirg, <br />4-- The well will then be purged using the-p=Zepump&.:Due to the -fact that the punirys must <br />purge water from depths as great 3s�70 to 80 fcet below ground surfac,,,- pe esm e <br />tigat r rng <br />fi-om .114 to I gaon per minate. 1 bis - purge rate does not appear to exceed the recharge <br />of the Wea - Purge water will be discharged to -the ground (.see Section <br />Dtpth to water will be tak= pedodically dudng purging. 'The purposeof <br />these measurtments is to monitor -,dmwdovm If a d=J= in groundwater elevation is <br />noted, the purge rate will be decrcasi«d until equidum (purge rate equals recliarge raw) <br />is achieved. -f he fitqu=cy of zne==inent will be -once every fly -e minutes initially <br />decreasing to once. everyone-bWhour once oquilibritim has been reached. <br />If equbrium cannot be reached, it will be necessary to purge the wa to d7=7— Purge'. <br />uatil 1= than 101% of the original volume of water t=ains in the well. Hand baWmg <br />=y be .•r !i to ined dds objective. Monitor the DTW every 15 minutes to evaluate <br />recharge. Stat sample collection wh�n either two fed of waW has filled the well or 1.75 <br />hours has elapsed since dm end of purgiugCollect volatile organics no iota ffian two <br />ho =** after purging. Record all actions and measurements amciated with pur.giq a well <br />dry on'the Purge Mr_ aerizadon and S . ample Log. <br />MIMEO&I <br />