Laserfiche WebLink
Ausenco <br />Vector <br />Project 14am: <br />Project No. <br />Daily Field Report sequence Number <br />I Forward VRvRJ FU -10 <br />USVtib 0004800 <br />032 <br />Location Of WO& <br />we] M, 1, 1 to 617 <br />Date. <br />M11 M_ <br />Stockton, CA <br />August 12,2010 <br />G eneral Contractor. <br />Pwject Enower <br />Guinn Construction 7 <br />Monte CliIII fistie <br />General Foreman: <br />Wier. <br />Kevin Tumer <br />Don Litchfield, Republic Services, <br />Source and Descripfim of FiR Matkaxial: <br />wa's X1 V; <br />Native processing area <br />silv_cb <br />Clear, It breeze, 50's-80'sF <br />Ikyjfm <br />Equipment on site. <br />3x637 scr4mrs, 143H blade, D6 dozer, :I compactor, 320D excavator, I water truck, 420E backhoe, CS54 smooth drum , 4206D <br />tractor w/disc, TL943 forldift, 623 paddle wheel scraper <br />NOTES (Describe work completed during the day, any problems and their solutions) <br />1. Construction Activities <br />1. Guinn Construction continued moisture conditioning all Clay Liner soils on the floor areas. <br />11. CQA Activities <br />monitored the off loading and completed inventory on 9 rolls/103,500 ft2 of Agru single -side <br />textured 60 mil HDPE liner and 2 rolls of welding rod. Off-loading was by Forward's forklift. <br />40 2. CQA monitored the off loading and completed inventory on 27 rolls/315,900 ft2 of SKAPS GE 170- <br />15, 7 oz/yd filter geotextile. Off-loading was by forklift. <br />3. CQA monitored the off loading and completed inventory on 27 rolls/194,400 ft� of SKAPS GE1 12- <br />15, 12 oz/yd cushion geotextile. Off-loading was by forklift. <br />III. Conversations <br />Emails to/from Monte Christie, AusencoVector, Re: CQA has the MQC certificates for all liner <br />materials, except for the 9 rolls of single -side textured HDPE delivered this morning; Monte has the <br />MQC certificates. <br />08/12/10 <br />1 of 2 <br />C-2 <br />Reviewed By: Rt <br />