My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010_21
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2010_21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:36 PM
Creation date
7/3/2020 10:55:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010_21
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2010_21.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C7 <br />3.3 Design Modifications <br />During the construction of WMU FU -10, modifications to the contract drawings and specifications <br />occurred. The approved modifications during construction of WMU FU -10 are included in Appendix <br />O. The modifications included accepting the large-scale direct shear testing results and approving <br />the local geotextile for use over the limited area on the 5:1 deck, <br />3.4 Final Report <br />Preparation of the Final Report, documenting the project construction CQA activities, was the last <br />task to complete the CQA program for the Forward Landfill WMU FU -10 composite liner system. This <br />report includes discussions of the findings and observations of the on-site CQA personnel regarding <br />the activities identified above. The documentation of construction and CQA activities are presented <br />on the field logs prepared by the CQA personnel, which are included in Appendix B of this report. <br />Also presented in the appendices of this report are the results of laboratory conformance tests <br />conducted on earthworks and geosynthetic materials. The report contains a discussion of the CQA <br />procedures performed by Ausenco Vector; a discussion of the construction activities; and a <br />description of the composite liner system components observed and tested by Ausenco Vector. <br />• Photographic documentation of this project was maintained by Ausenco Vector throughout the <br />construction period; select photos are presented in Appendix A. <br />• Daily Reports of construction and CQA activities are included in Appendix B. <br />• Earthworks documentation is included in Appendices C through G. <br />• Geosynthetics documentation is included in Appendices H through L. <br />• HDPE piping documentation is included in Appendix M. <br />• Certification survey data and as -built drawings are included in Appendix N. <br />• Design modifications are included in Appendix O. <br />Date: October 2010 <br />USVC0004800 <br />Final Construction Quality Assurance Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.