Laserfiche WebLink
Ausenco <br />Vector <br />rIT., U Vk q i#M &I <br />Project Name: !I Pmject No. Field Report <br />Forward WMU FU -10 11 :1t 035 <br />Client Or Mam"m Date: 1)" of Tlie We&: <br />161 M49 6 lffi��E Republic Services, Inc. August 17,2010 Tuesday <br />Gef WW cAmb-actor: _1 Lioff Conftacw. Project Enginw: <br />ti <br />Construction COMANCO Monte Christie <br />Genend Forenumi: <br />1IM"Wil odwr <br />Kevin Turner Don Litchfi eld, Republic Services, Inc. <br />i Source nd Description offill Mataial: <br />CQA Technician: <br />Native silty clays in SEC processing area Clear, It breeze, 50's -90's OF Michael Strobel <br />ExIttillment on site: <br />3x637 scrapers, D6 dozer, 320D excavator, I water awk, 420E backhoe, 4206D tractor w/disc, TL943 forklift, 623 paddle wheel <br />NOTES (Describe work completed during the day, any problems and their solutions) <br />1. Construction Activities <br />I . Guinn Construction continued moisture conditioning all Clay Liner soils on the floor areas. <br />2. Guinn Construction detailed the anchor trench at the top of the 5:1 slope; rounding the inside edge of <br />the trench and removing loose material from the bottom. <br />3. COMANCO starts deployment of the Cetco Bentomat on the 5:1 slope to floor. All panels are full <br />length and reach from the anchor trench to the bench, and from the bench to floor; all overlaps per <br />plan. There are no horizontal or butt seams on any of the panels, other for the overlap on the bench. <br />Material from I I rolls was used today and all roll numbers have been identified. <br />4. COMANCO started deployment of the Agru single -side textured 60 mil HDPE on the 5:1 slope, <br />textured side down, panels P- I through P-7: 24,057 W today. <br />[I. CQA Activities <br />1. CQA attended a pre -project safety meeting conducted by Clayton Lung with COMANCO. <br />2. CQA monitored deployment and completed the liner documentation logs and as -built drawings of the <br />GCL and HDPE panels, including the deployment logs for both materials, and the seaming and <br />pressure testing togs for the HDPE. <br />08/17/10 <br />1 of 2 <br />ME <br />Z <br />