My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010_21
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2010_21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:36 PM
Creation date
7/3/2020 10:55:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010_21
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2010_21.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ausenco <br />Vector <br />rIT., U Vk q i#M &I <br />Project Name: !I Pmject No. Field Report <br />Forward WMU FU -10 11 :1t 035 <br />Client Or Mam"m Date: 1)" of Tlie We&: <br />161 M49 6 lffi��E Republic Services, Inc. August 17,2010 Tuesday <br />Gef WW cAmb-actor: _1 Lioff Conftacw. Project Enginw: <br />ti <br />Construction COMANCO Monte Christie <br />Genend Forenumi: <br />1IM"Wil odwr <br />Kevin Turner Don Litchfi eld, Republic Services, Inc. <br />i Source nd Description offill Mataial: <br />CQA Technician: <br />Native silty clays in SEC processing area Clear, It breeze, 50's -90's OF Michael Strobel <br />ExIttillment on site: <br />3x637 scrapers, D6 dozer, 320D excavator, I water awk, 420E backhoe, 4206D tractor w/disc, TL943 forklift, 623 paddle wheel <br />NOTES (Describe work completed during the day, any problems and their solutions) <br />1. Construction Activities <br />I . Guinn Construction continued moisture conditioning all Clay Liner soils on the floor areas. <br />2. Guinn Construction detailed the anchor trench at the top of the 5:1 slope; rounding the inside edge of <br />the trench and removing loose material from the bottom. <br />3. COMANCO starts deployment of the Cetco Bentomat on the 5:1 slope to floor. All panels are full <br />length and reach from the anchor trench to the bench, and from the bench to floor; all overlaps per <br />plan. There are no horizontal or butt seams on any of the panels, other for the overlap on the bench. <br />Material from I I rolls was used today and all roll numbers have been identified. <br />4. COMANCO started deployment of the Agru single -side textured 60 mil HDPE on the 5:1 slope, <br />textured side down, panels P- I through P-7: 24,057 W today. <br />[I. CQA Activities <br />1. CQA attended a pre -project safety meeting conducted by Clayton Lung with COMANCO. <br />2. CQA monitored deployment and completed the liner documentation logs and as -built drawings of the <br />GCL and HDPE panels, including the deployment logs for both materials, and the seaming and <br />pressure testing togs for the HDPE. <br />08/17/10 <br />1 of 2 <br />ME <br />Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.