Laserfiche WebLink
Ausenco <br />Vector <br />NOTES (Describe work completed during the day, any problems and their solutions) <br />I. Construction Activities <br />I . Guinn Construction continued moisture conditioning all Clay Liner soils on the floor areas. <br />2. COMANCO continued and completed deployment of the Cetco, Bentomat on the 5:1 slope to floor. <br />Today's deployment: Panels P-3 7 through P-57, about 34,43 5 ft' today; about 99,284 ft2 (gross <br />deployment) to date. All panels run full length and all roll numbers have been identified. <br />3. COMANCO continued and completed deployment of the Agru single -side texWred 60 mil HDPE on <br />the 5:1 slope. All panels are ftl1l length and reach from the anchor trench to the floor. Panels deployed <br />today: P-14 through P-21; about 30,464 ft2 today; about 87,802 fe (gross) to date. <br />11. CQA Activities <br />1. CQA monitored all construction activities, including trial welds, as -built field maps, deployment, <br />seaming/pressure testing, and continued entries in the Repair Log. <br />2. CQA marked out HDPE liner Destructive Samples DS -4, 5 and 6. Three pieces are cut from each <br />destructive: one for AusencoVector, one for COMANCO, and one archive for Forward Landfill. The <br />AusencoVector desftuctives were mailed to Precision Labs in Anaheim for peel and shear tests. <br />3. <br />i' /' and COMANCO completed the Subgrade Acceptance for Tuesday's deployment of HDPE <br />panels P-9 through P- 13 about 32,281 ft2 (full roll dimensions including seam overlap and material in <br />anchor trench). <br />FIL Conversations <br />0 None listed. <br />08/19/10 <br />1 of <br />C-2 <br />MOMM <br />