Laserfiche WebLink
E'AMULRRI <br />PmjedName: <br />! l f <br />11 <br />t, ! 1 1SequenceNumber <br />MM <br />ForwaWW FU- 10rd <br />041 0 <br />1 <br />Date: <br />I*of'rhe Week: <br />_ Inc.i <br />.r. r Services, <br />Republic <br />1 <br />li Monday <br />'" � � 6 I- .7 C <br />`, l.� [ K 1 YF(i <br />Pfoject Engineer <br />t t t, t <br />�IIII� iMonte <br />other <br />it <br />• <br />/rLitchfield, Republic <br />Clear, tt breeze, 50's-98 T Michael Strobel <br />I,r on site: <br />i <br />3x637 scrapers,D1 dozer,truck,i backhoe, IL943 forklift,623 wheel scraper <br />NOTES(Describe work completed during the day, any problems and heir solutions) <br />1. Construction <br />1. Guinn Construction ai t =t moisture conditioning ,t on tt <br />2. COMANCO continued repairs on double -side texturer r( mil HDPEdeployed tfloor <br />and removed some wrinkles alongoFU-08. <br />3. COMANCO completed tof ie HDPE panels on tt to the material on tt, <br />01. <br />i. Activities <br />A monitored all constructionincluding trial welds,r t maps,1and <br />pressure testing, subgrade acceptance and repairs. <br />re-numbered2. CQA F1 ' Destructive Samplescollected from the floorof 1 Destructives <br />d 3 changed to DS -9, 10 and 11. Additional destructives DS- 12 through DS- 18 were <br />marked out and collected. The samples will be shipped Tuesday morning, 8/24, to the Precision <br />Geosyndietic LaboratoryAnaheim, CA, forand shear testing. <br />111. Conversations <br />rtt- t <br />'r - �., •.1 a .��`T��'I <br />08/23/10 <br />1 of 2 <br />C-2 <br />