My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010_21
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2010_21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:36 PM
Creation date
7/3/2020 10:55:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010_21
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2010_21.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ausenva, <br />Vector <br />Project <br />Forward 1 <br />I USVC0004800 <br />041 <br />/f.: f , <br />LFI • %4aa.I'tr <br />r.£' r ::. 11" Week: <br />��E <br />Republic Services, hic. <br />r <br />August 24, 10 Tuesday <br />Guinn Construction <br />miCOMANCO <br />Monte Christie <br />- f.:.superintendent:other. <br />Kevin Turner <br />. <br />Jose Hernandez <br />/r, <br />♦ / 1 Republic <br />t ,ff 1 rrfe a llcrial: <br />Weather. <br />. i ,r <br />CQATechnician- <br />Nativeprocessing <br />area <br />Clear,a breeze, 10 i �� A.Strobel <br />Equipment on site: <br />3x637 rs, 16 dozer, I water truck, 420E backhoe, TL943 forklift, 623 Laddle wheel scraper <br />NOTES(Describe work completed during the day, any problems and their solutions) <br />I. Construction <br />1. COMANCO continued deployment of r double -side textured i{ mil HDPEon ie south floor <br />areas of 1 Panels deployed today:P- 'throughP-26, . 1 1 1: r i 1 / ft2 • hs <br />approximately 237,215 W on the floor to date. <br />1. Q• Activities <br />I. CQA monitored all construction activities, including trial welds, as -built field maps, seaming and <br />pressure testing, subgrader • repairs. <br />samples2. CQA collected and shipped, via USPS, floor liner destructive samples DS -9 through DS- 18, to the <br />Precision Geosynthetic Laboratories in Anaheim, CA, for peel and shear tests. <br />3. CQA determined the locations for floor HDPE liner destructive samples DS -19 through DS -27; the <br />be 1 out and r .1 "d tomorrow a.m. This accountsfor destructives collected <br />from the floor1 r 1 9,500 lineal feet of seams. <br />4. CQA continued entries in the Repair Log: repairs R-33 through R-66 located today; mostly the <br />patches on the "T's" at the toe of the 2:1 slope and the destructives collected this morning. <br />FIL Conversations <br />0 None listed. <br />Prep By: Michael <br />08/24/10 <br />1 of 2 <br />C-2 <br />.. , A <br />
The URL can be used to link to this page
Your browser does not support the video tag.