:7 <br />L` <br />Geosynthetic Testing and Frequency <br />li' • • <br />• <br />• <br />0 <br />Geomembrane 433,620sf Density (D1505) <br />1 per 100,000 sf 5 <br />6 1 per 72,270 sf <br />Thickness (D5199) <br />1 per 100,000 sf 5 <br />6 1 per 72,270 sf <br />Asperity Height (GM -12) <br />1 per 100,000 sf 5 <br />6 1 per 72,270 sf <br />Tensile Strength (D638) <br />1 per 100,000 sf 5 <br />6 1 per 72,270 sf <br />Carbon Black Content <br />1 per 100,000 sf 5 <br />6 1 per 72,270 sf <br />(D1603) <br />Carbon Black Dispersion <br />1 per 100,000 sf 5 <br />6 1 per 72,270 sf <br />(D5596) <br />Large Scale Direct Shear <br />Clay/HDPE <br />1 per project 1 <br />1 1 per project <br />GCUHDPE/Geocomposite <br />1 per project 1 <br />1 1 per project <br />HDPE/Geotextile <br />1 per project 1 <br />1 1 per project <br />Seam Length 17,498 If Destructive Seam Tests <br />1 per 500 If 35 <br />35 1 per 4991f <br />Geosynthetic 99,284 sf Mass per Unit Area (D5993) <br />1 per 100,000 sf 2 <br />2 1 per 87,375 sf <br />Clay Liner (GCL) <br />Peel Strength (D4632) <br />1 per 100,000 sf 2 <br />2 1 per 87,375 sf <br />Hydraulic Conductivity <br />1 per 100,000 sf 2 <br />2 1 per 87,375 sf <br />(D5084) <br />Geotextile 684,000sf Mass per Unit Area (D5993) <br />1 per 100,000 sf 8 <br />9 1 per 76,000 sf <br />Grab Strength (D4632) <br />1 per 100,000 sf 8 <br />9 1 per 76,000 sf <br />Geocomposite 106,260sf Transmissivity (D 4716) <br />1 per 100,000 sf 2 <br />2 1 per 53,140 sf <br />Peel Strength (GRI GC 7) <br />1 per 100,000 sf 2 <br />2 1 per 53,140 sf <br />Thickness (D 5199) <br />1 per 100,000 sf 2 <br />2 1 per 53,140 sf <br />Tested quantities differ from actual installed quantities due to the use of existing <br />material (GCL) from FU -08 construction. The Final <br />CQA Report for FU -10 contains the data for this material. <br />4 Earthworks Construction <br />As the earthworks construction was implemented, <br />Ausenco Vector CQA performed construction <br />monitoring and earthworks testing. This section <br />describes the CQA tasks <br />associated with the <br />construction of the earthworks components of the WMU FU -10 composite <br />liner system. The <br />elements monitored and tested by Ausenco Vector <br />CQA and discussed within this section include <br />preparation of the existing subgrade and placement of Subgrade Fill soils; placement of the low <br />permeable Clay Liner (CL) soils; installation of the LCRS Coarse Gravel and <br />Granular Drainage <br />material; and placement of the Operations Layer soils. <br />The earthworks CQA activities performed by Ausenco Vector for the WMU FU -10 composite liner <br />construction included: <br />Date: October 2010 <br />USVC0004800 <br />Final construction Quality Assurance Report <br />