My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010_21
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2010_21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:36 PM
Creation date
7/3/2020 10:55:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010_21
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2010_21.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 It M <br />V Idbi <br />L nLM 9M <br />NOTES (Describe work completed during the day, any problems and their solutions) <br />1. Construction Activities <br />I . CONUNCO continued deployment of the SKAPS TN270-1-7 geocomposite on the 5:1 slope. 7 rolls <br />of material were deployed today, about 19,180 fe today; about 71,820 fe to date. <br />2. COMANCO starts deployment of the SKAPS GEI 12-15 12 oz/yd 2 cushion geotextile. The first panel <br />was deployed along the toe of the 2:1 slope; about 4,750 W of material. <br />is 3. Guinn Construction started moisture conditioning a small stockpile of clay plug soils, for anchor <br />trench backfill, on the deck above the 5:1 slope. <br />4. Ausencovector engineer Abigail Beck and technician Joe Davin start leak testing the DST 60 mil <br />HDPE on the floor areas. Forward provided two helpers to pull the hose and also their water truck <br />until a rental arrived supplied by Guinn Construction. Work began in the NWC proceeding south. By <br />the end of the day, testing reached the -south ridge." No leaks were found. <br />11. CQA Activities <br />1. CQA monitored construction activities and observed most of today's leak testing. <br />2. CQA completed Weekly Report 008, ending Saturday, August 28,2010. <br />Ill. Conversations <br />0 None listed. <br />W <br />
The URL can be used to link to this page
Your browser does not support the video tag.