My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010_21
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2010_21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:36 PM
Creation date
7/3/2020 10:55:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010_21
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2010_21.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ausenco <br />*Vector <br />Pmject Nam: <br /># <br />ftojod No. <br />Mily Field RopW sequence Nun*w. <br />Forward WMU FU- 10 <br />iml <br />USVC0004800 <br />047 <br />111R.W."CIPMr. WN."! <br />7e�®rmimsw <br />Date: Day ofThe Week: <br />Republic Services, Inc. <br />■ August 31, 2010 Tuesday <br />.A : ;r t♦)r =y(i .'w.9i <br />Liner Canuactor <br />Wojed Engineer. <br />■ <br />COMANCO <br />Monte Christie <br />Gemal Foff emaw <br />JjWSUP"Wendwt <br />Odw. <br />Kevin Turner <br />Jose Hernandez <br />Don Litchfield, Republic Services, Inc. <br />IPP�77'7111)77-771!7117 #1 "T, �-P <br />Weather. <br />CIM, It breeze, 50's -90's OF <br />jOrn 1&6111-7mil 1 <br />FEjis �rE on siw <br />3x637 scrapers, D6 dozer, I water trtwk, 420E backhoe, TL943 forkIM 623 paddle wheel scraper <br />NOTES (Describe work completed during the day, any probkm and their solutions) <br />1. Construction Activities <br />I . COMANCO started and completed deployment of the SKAPS TN270-1-7 geocomposite on the 2:1 <br />slope; material was used fiom 9 rolls, about 25,200 fe. A total of about 97,020 fe of geocomposite <br />was used on the slopes. <br />2. COMANCO continued deployment of the SKAPS GEI 12-15 12 ozly& cushion geotextile on the <br />south end of the FU- 10 rte, Fourteen (14) panels were deployed today, about 100,800 ft2. <br />Including the first panel deployed at the toe of the 2:1 slope, about 105,150 ft2 has been deployed to <br />date. <br />3. Guinn Construction started moisture conditioning the clay stockpile area to prepare material for <br />construction of the south termination berm. <br />4. Guinn Construction used the backhoe to place the first lift of moisture conditioned backfill clay plug <br />soils in the anchor trench on the top of the 5:1 slope. <br />5. AusencoVector engineer Abigail Beck and technician Joe Davin completed leak testing the DST 60 <br />mil HDPE on the floor areas. No leaks were found. <br />H. CQA Activities <br />1. CQA monitored construction activities and assisted during completion of the leak testing. <br />111. Conversations <br />0 None listed. <br />6 =., - 1 -.7m, F, - M=" ''=' , <br />09/31/10 <br />1 of 2 <br />NN <br />99MMUM <br />
The URL can be used to link to this page
Your browser does not support the video tag.