Laserfiche WebLink
Ausenco <br />• Vector <br />SUPPLEMENT/PHOTOS ONLY <br />DAILY CONSTRUCTION FIELD REPORT <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number: <br />Forward WMU FU -10 <br />USVC0004800 <br />006A <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Stockton, CA <br />Republic Services, Inc. <br />July 7, 2010 <br />Wednesday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Guinn Construction <br />Monte Christie <br />General Foreman: <br />Liner Superintendent: <br />Other: <br />Kevin Turner <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />Native silty -sandy clays, E side of cell <br />Clear, It. breeze W, 650-900+ F <br />Michael Strobel <br />Equipment on site: <br />5x637 scrapers, 143H blade, D6 dozer, 815 compactor, 321C excavator, 3 water trucks <br />Figure 1: Detail of Coarse Drainage Material in FU -08 under the middle leachate collection tank. The specifications say the <br />rock is to be "well rounded..." I see a lot of angular rock in the existing, and current, material delivered to site. Guinn <br />say's, "...same rock, same supplier as last year..." <br />By: <br />C-2 <br />07/07/10 <br />1 of 2 <br />Reviewed By: <br />