Laserfiche WebLink
Figure 1: The 321C excavator prepares to pothole into compacted Subgrade Fill soils placed in the NW area of the 5:1 <br />Figure 2: Checking the thickness in one of 3 potholes cut into the 5:1 slope. The long shovel measures 5111". <br />No refuse was encountered in any of the potholes cut to this depth. <br />Prepared By: Michael Strobel Reviewed By: ` <br />07/09/10 • <br />2 of 2 <br />C-2 <br />