My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010_21
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2010_21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:36 PM
Creation date
7/3/2020 10:55:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010_21
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2010_21.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ausenco <br />e Vector <br />Equipment on site: <br />5x637 !2=, 143H blade, D6 dozer, 815 22ELactor, 32 1 C excavator, 3 water trucks, 420E backhoe, smooth dnun roller <br />NOTES (Describe work completed during the day, any problems and their solutions) <br />1. Construction Activities <br />I . Guinn Construction continued finish grade work on the floor using the 143H blade w/GPS. Scrapers <br />collect the trimmings for delivery to a stockpile in the SWC of the future expansion area. <br />2. Guinn Construction started the smooth drum roller on the 2:1 slope. <br />3. Guinn Construction continued excavating the sumps for the leachate collection tanks; the D6 rips the <br />compacted subgrade; excavation is by the 420E backhoe. Scrapers take trimmings to stockpile. <br />4. Guinn Construction removed the existing 3" perforated pipe from behind the location of the <br />temporary south berm on the FU -08 deck. The 32 1 C excavator and 2 spotters continued removing <br />cover soils between the removed pipes and the shoulder of the 5:1 slope on FU -10. <br />IL CQA Activities <br />I . CQA performed ASTM D I 557A Proctor compaction on Subgrade Fill sample SFS -5. <br />2. CQA counted 8 rolls of GCL Bentomat left over from previous projects: no roll numbers could be <br />located; CQA has the original inventory on this material indicating the MQC certificates were <br />approved - <br />3. CQA received an emafl fiom Monte Christie: the permeability tests passed on the Coarse Gravel and <br />Granular Drainage submittal samples, CG- I and DG- I respectively, and that the material is accepted <br />for use on this project <br />9 None listed. <br />07/16/10 <br />1 of 2 <br />AN <br />zzz�Ml <br />Daily Field Report Sequence Nun*a <br />Forward WMU FU -10 <br />USVC0004800 <br />013 <br />Location of Work: <br />Client Or ManagmRep <br />t' 3. <br />Stockton, CA <br />ublic Services, Inc. <br />General C1 1 ract <br />1 I « i <br />wject Enginea: <br />Guinn Construction <br />Monte Christie <br />Ckneral Foreman: <br />W'[1 -Ili- f <br />Kevin Turner <br />weathw <br />CQA Technician: <br />BUTM M- <br />Clear, breezy, <br />700-104' F <br />Michael Strobel <br />Equipment on site: <br />5x637 !2=, 143H blade, D6 dozer, 815 22ELactor, 32 1 C excavator, 3 water trucks, 420E backhoe, smooth dnun roller <br />NOTES (Describe work completed during the day, any problems and their solutions) <br />1. Construction Activities <br />I . Guinn Construction continued finish grade work on the floor using the 143H blade w/GPS. Scrapers <br />collect the trimmings for delivery to a stockpile in the SWC of the future expansion area. <br />2. Guinn Construction started the smooth drum roller on the 2:1 slope. <br />3. Guinn Construction continued excavating the sumps for the leachate collection tanks; the D6 rips the <br />compacted subgrade; excavation is by the 420E backhoe. Scrapers take trimmings to stockpile. <br />4. Guinn Construction removed the existing 3" perforated pipe from behind the location of the <br />temporary south berm on the FU -08 deck. The 32 1 C excavator and 2 spotters continued removing <br />cover soils between the removed pipes and the shoulder of the 5:1 slope on FU -10. <br />IL CQA Activities <br />I . CQA performed ASTM D I 557A Proctor compaction on Subgrade Fill sample SFS -5. <br />2. CQA counted 8 rolls of GCL Bentomat left over from previous projects: no roll numbers could be <br />located; CQA has the original inventory on this material indicating the MQC certificates were <br />approved - <br />3. CQA received an emafl fiom Monte Christie: the permeability tests passed on the Coarse Gravel and <br />Granular Drainage submittal samples, CG- I and DG- I respectively, and that the material is accepted <br />for use on this project <br />9 None listed. <br />07/16/10 <br />1 of 2 <br />AN <br />zzz�Ml <br />
The URL can be used to link to this page
Your browser does not support the video tag.