Ausenco <br />e Vector <br />Equipment on site: <br />5x637 !2=, 143H blade, D6 dozer, 815 22ELactor, 32 1 C excavator, 3 water trucks, 420E backhoe, smooth dnun roller <br />NOTES (Describe work completed during the day, any problems and their solutions) <br />1. Construction Activities <br />I . Guinn Construction continued finish grade work on the floor using the 143H blade w/GPS. Scrapers <br />collect the trimmings for delivery to a stockpile in the SWC of the future expansion area. <br />2. Guinn Construction started the smooth drum roller on the 2:1 slope. <br />3. Guinn Construction continued excavating the sumps for the leachate collection tanks; the D6 rips the <br />compacted subgrade; excavation is by the 420E backhoe. Scrapers take trimmings to stockpile. <br />4. Guinn Construction removed the existing 3" perforated pipe from behind the location of the <br />temporary south berm on the FU -08 deck. The 32 1 C excavator and 2 spotters continued removing <br />cover soils between the removed pipes and the shoulder of the 5:1 slope on FU -10. <br />IL CQA Activities <br />I . CQA performed ASTM D I 557A Proctor compaction on Subgrade Fill sample SFS -5. <br />2. CQA counted 8 rolls of GCL Bentomat left over from previous projects: no roll numbers could be <br />located; CQA has the original inventory on this material indicating the MQC certificates were <br />approved - <br />3. CQA received an emafl fiom Monte Christie: the permeability tests passed on the Coarse Gravel and <br />Granular Drainage submittal samples, CG- I and DG- I respectively, and that the material is accepted <br />for use on this project <br />9 None listed. <br />07/16/10 <br />1 of 2 <br />AN <br />zzz�Ml <br />Daily Field Report Sequence Nun*a <br />Forward WMU FU -10 <br />USVC0004800 <br />013 <br />Location of Work: <br />Client Or ManagmRep <br />t' 3. <br />Stockton, CA <br />ublic Services, Inc. <br />General C1 1 ract <br />1 I « i <br />wject Enginea: <br />Guinn Construction <br />Monte Christie <br />Ckneral Foreman: <br />W'[1 -Ili- f <br />Kevin Turner <br />weathw <br />CQA Technician: <br />BUTM M- <br />Clear, breezy, <br />700-104' F <br />Michael Strobel <br />Equipment on site: <br />5x637 !2=, 143H blade, D6 dozer, 815 22ELactor, 32 1 C excavator, 3 water trucks, 420E backhoe, smooth dnun roller <br />NOTES (Describe work completed during the day, any problems and their solutions) <br />1. Construction Activities <br />I . Guinn Construction continued finish grade work on the floor using the 143H blade w/GPS. Scrapers <br />collect the trimmings for delivery to a stockpile in the SWC of the future expansion area. <br />2. Guinn Construction started the smooth drum roller on the 2:1 slope. <br />3. Guinn Construction continued excavating the sumps for the leachate collection tanks; the D6 rips the <br />compacted subgrade; excavation is by the 420E backhoe. Scrapers take trimmings to stockpile. <br />4. Guinn Construction removed the existing 3" perforated pipe from behind the location of the <br />temporary south berm on the FU -08 deck. The 32 1 C excavator and 2 spotters continued removing <br />cover soils between the removed pipes and the shoulder of the 5:1 slope on FU -10. <br />IL CQA Activities <br />I . CQA performed ASTM D I 557A Proctor compaction on Subgrade Fill sample SFS -5. <br />2. CQA counted 8 rolls of GCL Bentomat left over from previous projects: no roll numbers could be <br />located; CQA has the original inventory on this material indicating the MQC certificates were <br />approved - <br />3. CQA received an emafl fiom Monte Christie: the permeability tests passed on the Coarse Gravel and <br />Granular Drainage submittal samples, CG- I and DG- I respectively, and that the material is accepted <br />for use on this project <br />9 None listed. <br />07/16/10 <br />1 of 2 <br />AN <br />zzz�Ml <br />