Laserfiche WebLink
to -0.3' below top of design clay grade; Guinn asked if it is alright to start placing the Clay? C A is <br />comfortable with survey information. Bryan said that Guinn can place clay at their risk pending <br />approval of the Subgrade survey by Monte Christie. <br />Figure 1: East view showing the edge of the geogrid where the trench intersects the slope liner anchor trench on FU -08. <br />The 3" pipe and gravel layer trench can be seen on the left side center of the picture. <br />Figure 2: Northwest view of the 5:1 slope for FU -10. The excavator works on the tie-in/anchor trenches for the <br />geogrid/geocomposite on the east limits of FU -08. FU -08 geocomposite in left -center of photo. <br />• <br />• <br />Prepared By: Michel Strobel Reviewed By <br />07/20/10 i <br />C-2 2 of 2 <br />