Laserfiche WebLink
Figure 1: North view of progress in FU -10; the D6 is trimming the central floor using GPS; the 143H blade w/GPS cuts <br />finish grade on the north floor, the 623 paddle wheel collects the trimmings; the 420E back hoe cuts the anchor trench at <br />the top of the 5:1 slope and the water truck moisture conditions ahead of the backhoe. <br />�'-,e.';C•. 9' d,-..i4:� "R�.p _. y-._ ni "�'' �. � - »es�.."a l'i i, �,.,_ .._ <br />Figure 2: Southeast view: existing FU -08 side slope geocomposite and geogrid in right foreground. At the left of photo the <br />back hoe excavates the anchor trench for the 5:1 slope liner system. <br />Prepared By: Michael Strobel Reviewed By: 411C <br />08/03/10 <br />2 of 2 <br />C-2 <br />• <br />• <br />