Laserfiche WebLink
[PI, TIV101015.1 I hol 11030013" 4:4 #;[*J;4 i <br />IN Vi 7W., I MDady <br />Fidd Rqx)it Sequeme Numbef- <br />WMETTZMLIM I a I <br />KIRM161111111111i JT <br />027 <br />— --------- <br />Lacsfim of Work: <br />111=411117, .......................... <br />Stockton, CA <br />Republic_Services, Inc. ___-J- <br />August 5, 2010 <br />Projed En&wer. <br />Monte Christie <br />Genual Forenum <br />other. <br />'Kevin Turner <br />Don Litchfield, Republic Services, Inc. <br />W1 M -47M I D -77r. MMM, M i M t LT, F7 MM <br />Weather <br />A <br />C It breeze, 549-900 F <br />Tq "I <br />skyjFMIT-M-161 <br />F4u4mwnt on site: <br />3x637 scrapers, 143H blade, D6 dozer, 815 compactor, 320D excavator, I water truck, 420E backhoe, CS54 smooth dnim, 4206D <br />tractor w/disc TL943 forklik 623 aaddle wheel scram <br />NOTES (Describe work completed during the day, any problems and their utions) <br />1. Construction Activities <br />I . Guinn Construction used the 143H blade w/GPS to cut the N -S leachate collection trench along the <br />east side of FU -10. <br />2. Guinn Construction used the D6 to continue minor excavation in the leachate tank sumps. <br />3. Guinn Construction continued moisture conditioning all Clay Liner soils on the floor areas. <br />4. Guinn Construction used the 143H blade w/ GPS to finish excavation of the N -S leachate trench <br />along the east side of the floor. <br />5. Guinn Construction used the small 320D excavator and a spotter to detail the leachate collection <br />ditches running W—E across the FU- 10 floor. Later in the day the excavator moved into the leachate <br />tank sumps. <br />H. CQA Activities <br />I . CQA performed Atterberg Limits on Clay Liner samples CLS -2 and CLS -3. <br />2. CQA collected Clay Liner sample CLS -5 for interface friction tests using FU- 10 geosynthetic liner <br />materials. A duplicate sample was collected to determine the Proctor moisture -density relationships. <br />3. CQA collected a 2'x 14.5' sample of Cetco Bentomat GCL for interface friction tests from roll <br />#00007244 left over from FU -08 construction. CQA has this roll listed in the FU -08 Receiving Log. <br />4. CQA collected a 2'x22.5' sample of double -sided textured Agru Microspike 60mil HDPE liner from <br />roll # 803546-10. CQA has the MQC certificate on this roll. <br />08/05/10 <br />1 of <br />M <br />Reviewed By: X1,11 <br />