Laserfiche WebLink
Mr. Robert McClellon • • <br /> October 15, 2010 <br /> Page 3 <br /> Comment#6: The plan on page 5, in the background paragraph, it stated that the SWFP is <br /> currently being revised to include the southwestern expansion as a buffer area. <br /> Currently the EHD has not received an application for permit revision. <br /> Response#6: On page 5, the background paragraph is revised to state "The Solid Waste Facility <br /> Permit is currently being revised to include the southwestern expansion area as a <br /> buffer zone and will be submitted to the EHD once complete." <br /> In response to comments#3 and#4, SCS and Forward will perform an evaluation to determine <br /> the appropriate locations and operation procedures of the proposed SVE wells that will be <br /> effective in controlling LFG and that will be satisfactory to CalRecycle and the EHD. A revised <br /> SVE installation work plan and operation procedure will be submitted to CalRecycle and the <br /> EHD within 5 days of receipt of this letter. If you have any questions regarding these responses, <br /> please contact the undersigned at(916) 361-1297. <br /> Sincerely, <br /> t1 � <br /> l�10 <br /> Christopher J. Heiny Ambrose A. McCready, PE <br /> Staff Professional Project Director <br /> SCS ENGINEERS SCS ENGINEERS <br /> cc Attention: Forward Landfill (SWIS 39-AA-0015) <br /> Title 27 Compliance <br /> CalRecycle <br /> Permitting and LEA Support Division <br /> 1001 "I" Street, P.O. Box 2815 <br /> Sacramento, California 95812-2815 <br /> Ross Atkinson, ratkinson@waterboards.ca.gov <br /> Kevin Taylor, kevin.taylor@calrecycle.ca.gov <br /> Scott Walker, scott.walker@calrecycle.ca.gov <br /> Gino Yekta, gino.yekta@calrecycle.ca.gov <br /> Don Litchfield, Republic <br /> Enclosures: San Joaquin Comment Letter dated October 13, 2010. <br />