Laserfiche WebLink
Geo-Logic <br /> A S S 0 C I A T E S <br /> Geologists,Hydrogeologists and Engineers RECEIVED <br /> A i� 31 NQ January 30, 2012 <br /> JN: 2011-0043 <br /> ENVIRONMENTAL HEALTH <br /> Mr. Ross Atkinson PERMIT/SERVICES <br /> Central Valley Regional Water Quality Control Board <br /> 11020 Sun Center Drive, Suite 200 <br /> Rancho Cordova, CA 95670-6114 <br /> GROUNDWATER TREATMENT FACILITY MONITORING REPORT <br /> FOURTH QUARTER 2011 <br /> FORWARD LANDFILL <br /> SAN JOAQUIN, CALIFORNIA <br /> INTRODUCTION <br /> On behalf of Forward Inc. (Forward)odftegic Associates (GLA) is submitting this <br /> summary report for the Forward Landfill groundwater treatment facility(GTF)to fulfill <br /> the requirements established by Waste Discharge Requirements (WDRs) Order No. R5- <br /> 2003-0080. <br /> The Forward Landfill is an active facility located at 9999 South Austin Road in Manteca, <br /> California. Following detection of volatile organic compounds (VOCs) in groundwater, a <br /> Corrective Action Program(CAP) was implemented at the site in 1994, which currently <br /> includes five groundwater extraction wells (EW-1, EW-2, EW-3, EW-313, and EW-4) <br /> that pump groundwater through an air stripper treatment system to remove VOCs. The <br /> treated groundwater is discharged to an infiltration pond north of the Austin Road Unit of <br /> the Forward Landfill. Included herein is a summary of the water quality monitoring <br /> results for the GTF at the Forward Landfill for the fourth quarter 2011. <br /> CAP MONITORING PROGRAM RESULTS <br /> Under WDR Order No. R5-2003-0080, effluent monitoring consists of monthly analysis <br /> of pH, specific conductance (EC), and VOCs; quarterly analysis for total dissolved solids <br /> (TDS); and annual analysis of 24 metals. In addition, influent is monitored semiannually <br /> for pH, EC, turbidity, and VOCs. Del-Tech Geotechnical Support Services (Del-Tech) <br /> performs the operation and maintenance (O&M) duties and performs bimonthly <br /> inspections for the Forward Landfill GTF. The results of the bimonthly inspections are <br /> presented below and summarized in Table 1. The field monitoring logs and laboratory <br /> results are attached. <br /> Operational Summary - As shown in Table 1, between September 12 and December 13, <br /> 2011 the CAP system treated approximately 19,539,200 gallons of groundwater at an <br /> average flow rate of 147 gallons per minute, or 212,383 gallons per day. During the <br /> 11415 W. Bernardo Court, Suite 200, San Diego,California 92127 Phone: (858)451-1136 FAX: (858)451-1087 <br />