Laserfiche WebLink
Proiect Narne 1 (YIZIUA)Qb <br />P !JVALUE <br />Unit Tested ENGINEERING <br />ANNUAL LCRS GAS TESTINSPECTION <br />(C) GAS D-ETECTION MONITORING LOG <br />Vacuum1blower start time: VaWttm/blovvey flow reading: N 0((21 <br />D(ws the vacuum/blower reading indicate that the cutup is blocked with water? Yes NO <br />Tinte Reudii.,L' (Imm) Timeg-�qdin, _pj) <br />Time Reading (Rom) <br />Was �,,as detected fivin the LCRS sump? Yes No 1, No, complete a MWO. <br />g __4 — <br />. . ti <br />............. <br />1tcmedial Action <br />Work Orck-r <br />Date Completed <br />Signature <br />/00 <br />Ile, <br />Time Reading (Rom) <br />Was �,,as detected fivin the LCRS sump? Yes No 1, No, complete a MWO. <br />g __4 — <br />. . ti <br />............. <br />1tcmedial Action <br />Work Orck-r <br />Date Completed <br />Signature <br />Ile, <br />S <br />............ <br />.......... <br />.. <br />Page 2 of 2 <br />E <br />E <br />E <br />