Laserfiche WebLink
a i ! X `. <br />1. 7 v rIYiM PROTOCOL <br />Tile Sampling and Analysis Plu (Kkinfelder, Novemberl, I M) describes <br />conducts WOUndwaWmonitoring y i. <br />.. 1 id*amadOncontained in he P1. <br />supercedes =.-dons related to smpfinS and <br />am-Jysis in the April8ti • s• • t s <br />d Y♦ a :rad 'd a • t :.•# * d • i x •. 3 w 33 i <br />:+# a♦ • 1' methodsand <br />procedtirvs discussed in this..►f«st <br />Kle-iafelder Field Actid r• <br />coL am an excelptof themom comprehensive S=Pling and Analysis <br />PIaIL <br />GROUNDWATER <br />The groundwater ».wells at Forwardareequipped with <br />dedicated <br />purging' i w c011ectiOn! a <br />• 1! is _ f # f i s ♦. <br />wfaait0ringwillhave of <br />et <br />as athat-should be availablex wW,6h <br />a# w a i •grneneccss,,y <br />r_quipment, is fisted below. <br />w ls,equi <br />Vraent used <br />•• x and Sample the a addition, <br />r# #i Pm4=dvcgear that as <br />ust be ' f; t i <br />Pr'OtddiOn and to reduce the potendW for =xns c0W=ULnxdGa Of the Wz1b and sampl= Som, of <br />the eqizfq=,cnt <br /># includes w.variouskstrumcats which wt ; <br />re s ,fes#Calibration- <br />Procedures <br />ar aiP:r z c..r «. are r +. «t below. <br />Water <br />indicators <br />being measured <br />incorrectli a • # cable w #! a rWater <br />indicator a out <br />to Its entire length and measured against a t" measum The 0 point is the Point on dn probe <br />which completes the circuit When contacted by the waw. 1"his completed ch -,if 41ra-v"Ift 6A <br />M, - - <br />M- <br />MM. <br />M � j <br />C <br />• <br />