Laserfiche WebLink
2. Upon arriving at the sample station, the .kz:oprt' ne rubber ends of the sample lines are <br />checked for dirt and dust accumulation. if necessary,sample, lines flushed <br />with <br />distilled water. <br />I The pressurcNacuum fine is connected to the vacum gage of the bandvacuum . <br />" P p <br />The clamp on the vacuum fine is opened and the residual V=um . remaiuing on the, <br />"lysimeter unit is measuredani reco, rded on the ly ` -ter " ling log. <br />4: The pressurevacuum Jim I is cannected to`the presst". purap and the discharge ( ple) <br />line o n Thedischarge line is ted into a zserved I plastic bottle <br />prepared and supplied by the analytical labomtory, <br />S, The pressum purnp is activated, forcing aiT into -tile lYsimeter. If additional pressure, is <br />needed to retrieve the fluid more ` y. the liressure is increased until adequate tlo-W is <br />achieved - <br />6. Tian sample is spli <br />