My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2011_25
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2011_25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 12:45:50 AM
Creation date
7/3/2020 10:56:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2011_25
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2011_25.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
410
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Austin Road Landfill Health&Safety Plan <br /> Austin Road Landfill, Stockton, California Page 3 <br /> • Be alert to potentially changing exposure conditions as evidenced by perceptible <br /> odors, unusual appearance of excavated soils,oily sheen on water,etc, <br /> • Be alert to the symptoms or fatigue and heat/cold stress, and their effect on the <br /> normal caution and judgement of personnel, <br /> Establish prearranged hand signals or other means of emergency communication <br /> when wearing respiratory equipment, since this equipment seriously impairs speech <br /> communications, <br /> • Noise may pose a health and safety hazard during drilling and construction activities. <br /> A good rule of thumb to follow is that if you have to shout in order to communicate a <br /> distance of 3 feet in steady state (continuous) noise, you should be wearing hearing <br /> protection. Likewise, any impact noise from activities such as driving casing during <br /> drilling which is loud enough to cause discomfort would also indicate the need for <br /> hearing protection,and <br /> • Always wear an appropriate level of personal protection. Lesser levels of protection <br /> can result in preventable exposure; excessive levels of safety equipment can impair <br /> efficiency and increase the potential for accidents to occur. <br /> 1.4 Site Control Procedures <br /> All project personnel will check in with the H&A Field Leader on a daily basis. Authorized personnel will <br /> accompany any visitors to the work site. Due to certain security protocols at the NCYCC facility, any <br /> and all contractors and subcontractors are required to gain security clearance before entering the <br /> facility. To acquire security clearance, the following information must be provided to the field project <br /> leader: Full name, date of birth, license number, and state. The information will be distributed to the <br /> appropriate security personnel at the NCYCC facility, who will then issue a security clearance to the <br /> individual making the request.A gate pass will be issued to all individuals and must be presented upon <br /> entrance to or exit from the facility. <br /> 1.5 Site Safety Briefing <br /> Prior to commencement of field investigative activities at the Austin Rd Landfill and NCYCC Facility <br /> Sites, the Contractor and Subcontractor field personnel will attend an on-site safety orientation. This <br /> orientation will include,at a minimum,the following topics: <br /> • A discussion of the scope of work for the project, <br /> • Locations of site emergency equipment and contacts, <br /> • Personal protective equipment requirements and action levels,and <br /> • Site safety procedures. <br /> This briefing will be repeated for new employees and supported with weekly"tailgate"health and safety <br /> briefings. The weekly briefings will be conducted according to a schedule established by the Field <br /> Team Leader, and will be supplemented with additional briefings if site conditions change or are <br /> different than anticipated by this HASP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.