Laserfiche WebLink
Part 3.FACILITY INFORMATION <br /> A.PROPOSED CHANGE(Check applicable box(es)): <br /> ®1 DESIGN(describe) <br /> M2 OPERATION(describe) <br /> M3 OWNER,OPERATOR,ADDRESS,AND/OR FACILITY NAMF CHANGE(describe) <br /> ®4.OTHER(describe) Re%nsmm of Facility Boundary to incorporate buffer area only <br /> B.FACILITY INFORMATION: <br /> 1.INFORMATION APPLICABLE TO ALL FACILITIES: <br /> a. PEAK DAILY TONNAGE OR CUBIC YARDS <br /> 8.668 tons per day(TPO)-Beneficial reuse material quantities listed below are a subset of this peak disposal inflow rate in no <br /> 1) DISPOSALITRANSER(unit) case will any ruination of MSW and the beneficial reuse materials exceed 8,668 TPD <br /> Processed Green Matenal-1,100 tons.Contaminated Solt-3,200 tons,Beneficial Reuse Inerts-3,000 tons,Ash and Cement <br /> 2) OTHER(unit) Kd1 Dust-172 tons,Treated Auto Shredder Waste-915 tons,and Shredded Tires-215 tons(refer to JTD Section 4 3.1) <br /> b. DAILY DESIGN TONNAGE(TPD) 8,668 tons <br /> c. FACILITY SIZE(acres) 744 acres(based on Assesor's Parcel Information) <br /> d, PEAK TRAFFIC VOLUME PER DAY(vpd) 620 <br /> Receipt of Waste:Monday through Saturday 4 00 am to 9 00 pm;Facility Operating Hours Monday through Saturday <br /> e. DAYS AND HOURS OF OPERATION 400s to 330 pm,Sunday Receipt of Waste and Operating Hours Ten(10)Sundays per year 7.00 am to 4 00 pm. <br /> 2.ADDITIONAL INFO.REQUIRED FOR COMPOSTING FACILITIES ONLY: <br /> a SITE STORAGE CAPACITY(cu yds) Not applicable <br /> 3.ADDITIONAL INFORMATION REQUIRED FOR LANDFILLS ONLY: <br /> a AVERAGE DAILY TONNAGE(TPD) 5,520 <br /> b SITE CAPACITY CURRENTLY PERMITTED(Airspace)(cu yds) 51.0 mcy <br /> c SITE CAPACITY PROPOSED(Airspace)(cu yds) Not Applicable <br /> d SITE CAPACITY USED TO DATE(Airspace)(at yds) 28 5 mcy <br /> e, SITE CAPACITY REMAINING(Airspace)(cu yds) 22 5 mcy <br /> I DATE OF CAPACITY INFORMATION(Date)(See instructions) 618/2011 <br /> g LAST PHYSICAL SITE SURVEY(Date) 3/17/2011 <br /> h ESTIMATED CLOSURE DATE(month and year) Aug-20 <br /> i_ DISPOSAL FOOTPRINT(acres) 354 5 acres <br /> j. SITE CAPACITY PLANNED(cu yds) Not Applicable <br /> Ic 1 (1) IN-PLACE WASTE DENSITY(lbs of waste per cu yd of waste) 1788 Itch <br /> AND <br /> (ii)WASTE-TO-COVER RATIO(Estimated)(v:v) 4:1 <br /> OR <br /> 2. AIRSPACE UTILIZATION FACTOR(tons of waste per cu yd of landfill airspace) <br /> Part 4.SOURCE OF WATER SUPPLY(Check applicable boxes) <br /> MA MUNICIPAL OR UTILITY SERVICE <br /> R S INDIVIDUAL(wells) <br /> ®C SURFACE SUPPLY <br /> 1 NAME OF STREAM..LAKE:ETC <br /> 2 TYPE OF WATER RIGHTS <br /> ORIPARIAN ❑APPROPRIATION <br /> 3 STATE PERMIT OR LICENSE NUMBER.IF APPLICABLE <br /> Page 2 <br />