My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2011_25
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2011_25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 12:45:50 AM
Creation date
7/3/2020 10:56:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2011_25
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2011_25.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
410
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />BAS i I LP <br />GENERAL HEALTH AND SAFETY PLAN FOR LANDFILL SITE ACTIVITIES <br />SITE SPECIFIC INFORMATIONSUPPLEMENT <br />FORWARD LANDFILL <br />SITE IDENTIFICATION AND CONTACTS <br />Client Forward Landfill <br />Address 9999 So. Austin Rd. <br />City Manteca State CA <br />Date(s) of work Begin 6/1/19 <br />Client Contact Primary Ruben Ramerez <br />Secondary Don Litchfield <br />SITE HISTORY AND DESCRIPTION OF WORK PLAN <br />A. Site History <br />Thomas Brothers <br />Map Coordinate _ <br />Phone Number (209)982-4298 <br />Zip Code 95336 <br />Phone Number (_209)969--9952 <br />Phone Number (209)982-4298 <br />Forward Landfill its owned and operated by Republic Waste Services. <br />The site is designated as a Class 3 municipal solid waste facility. <br />B. This Workplan is to be used in conjunction with BAS Construction (BASC) General Health and Safety Plan <br />for Landfill Site Activities. The Objective of the Workplan is to drill and install gas well(s), leachate <br />collection well(s) and/or groundwater monitoring wells. Describe any additional Workplan activities below. <br />Landfill gas monitoring probes gas collection piping <br />Ill. KEY PERSONNEL AND RESPONSIBILITY <br />The responsibilities of key personnel are described in the BASC General Health and Safety Plan for Landfill Site <br />Activities. The Key Personnel are identified as follows: <br />PROJECT MANAGER Kelly McGregor <br />SITE SAFETY OFFICER Steve Maddox Matt Rugh <br />
The URL can be used to link to this page
Your browser does not support the video tag.