Laserfiche WebLink
E <br />BAS i I LP <br />GENERAL HEALTH AND SAFETY PLAN FOR LANDFILL SITE ACTIVITIES <br />SITE SPECIFIC INFORMATIONSUPPLEMENT <br />FORWARD LANDFILL <br />SITE IDENTIFICATION AND CONTACTS <br />Client Forward Landfill <br />Address 9999 So. Austin Rd. <br />City Manteca State CA <br />Date(s) of work Begin 6/1/19 <br />Client Contact Primary Ruben Ramerez <br />Secondary Don Litchfield <br />SITE HISTORY AND DESCRIPTION OF WORK PLAN <br />A. Site History <br />Thomas Brothers <br />Map Coordinate _ <br />Phone Number (209)982-4298 <br />Zip Code 95336 <br />Phone Number (_209)969--9952 <br />Phone Number (209)982-4298 <br />Forward Landfill its owned and operated by Republic Waste Services. <br />The site is designated as a Class 3 municipal solid waste facility. <br />B. This Workplan is to be used in conjunction with BAS Construction (BASC) General Health and Safety Plan <br />for Landfill Site Activities. The Objective of the Workplan is to drill and install gas well(s), leachate <br />collection well(s) and/or groundwater monitoring wells. Describe any additional Workplan activities below. <br />Landfill gas monitoring probes gas collection piping <br />Ill. KEY PERSONNEL AND RESPONSIBILITY <br />The responsibilities of key personnel are described in the BASC General Health and Safety Plan for Landfill Site <br />Activities. The Key Personnel are identified as follows: <br />PROJECT MANAGER Kelly McGregor <br />SITE SAFETY OFFICER Steve Maddox Matt Rugh <br />