My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2011_25
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2011_25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 12:45:50 AM
Creation date
7/3/2020 10:56:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2011_25
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2011_25.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
410
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IO <br />X. <br />Xl. <br />M <br />BAS CONSTRUCTION LP <br />GENERAL HEALTH AND SAFETY PLAN FOR LANDFILL SITE ACTIVITIES <br />SITE SPECIFIC INFORMATION SUPPLEMENT <br />LEVELS OF PROTECTION <br />The minimum Personal Protective Equipment (PPE) to be utilized in the drilling area is: hardhat, ear protection <br />(ear plugs or muffs), safety glasses, steel -toed work shoes, and work clothes. <br />Based on review of site formation and the results of monitoring, what is the initial level of Personal Protective <br />Equipment? <br />Level D X Level C (what type of cartridges ) <br />NOTE: Based on periodic monitoring and site conditions, the level of PPE may be upgraded or downgraded. <br />SAFE WORK PRACTICES FOR LANDFILL GAS EXTRACTION SYSTEM INSTALLATION <br />Personnel are to follow the safe work practice detailed in the BASC General Health and Safety Plan for Landfill <br />Site Activities. <br />YES—/NO X <br />If Yes, list the practices <br />Are there any additional site specific safe work practices? <br />DISPOSAL OF DRILLING FLUIDS / CUTTINGS <br />The site operator is responsible for the proper characterization and disposal of the drill cuttings. What is the <br />intended management method for the drill cuttings (e.g., store in bin for generator)? <br />All trenching drilling spoils are to be loaded directly into dump trucks and transported to the open area. <br />UTILITIES <br />YES—/NO X Have underground utilities been identified? <br />If YES, what underground utilities are in the area? <br />Who located and how are the utilities marked? Non are anticipated. <br />YES X /NO_ Are aboveground utilities present which could present hazards? <br />If YES, what aboveground utilities are in the area? Over head power lines <br />DECONTAMINATION PROCEDURES <br />Personnel are to follow the decontamination procedures detailed in the BASC General Health and Safety Plan for <br />Landfill Site Activites. <br />Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.