Laserfiche WebLink
MONITORING WELL REPORT REQUIREMENTS -2 <br /> E. Well Development: <br /> Date(s) and method of development <br /> How well development completion was determined <br /> Volume of water purged from well and method of development water disposal <br /> Field notes from well development should be included in report <br /> F. Well Survey (survey the top rim of the well casing with the cap removed): <br /> Identify the coordinate system and datum for survey measurements <br /> Describe the measuring points (i.e. ground surface, top of casing, etc.) <br /> Present the well survey report data in a table <br /> Include the Registered Engineer or Licensed Surveyor's report and field notes in <br /> appendix <br /> G. Well Sampling <br /> Description of groundwater well sampling <br /> Groundwater Quality Data from the Well Sampling <br /> Groundwater flow map <br /> Updated Iso-concentration maps of groundwater plume. <br /> H. Cleanup and Abatement Order R5-2008-0714 <br /> Provide a discussion of current and future activities related to the Order <br /> Provide a schedule for future activities <br /> Update Financial Assurance estimate for Corrective Action Program. <br />