Laserfiche WebLink
2-3 <br /> the local agency's storm drain system. Moreover, an amendment will be filed if the site is <br /> found to be in violation of any conditions of the NPDES. <br /> 2.5 Leachate Collection and Removal System/Monitoring <br /> The majority of the existing WMUs at the FL contain blanket leachate collection and removal <br /> system (LCRS) systems. There is no LCRS on the base of the northerly unlined portion of the <br /> FL. The Stage 1B Partial Final Closure area will not include any of the lined areas that have <br /> LCRS systems (i.e., WMU FU-03, FU-04, and FU-05). <br /> Forward Landfill Stage 1B Partial Final Closure/Post-Closure Maintenance Plan June 2011 <br /> SWT Engineering <br /> z:\projects\allied waste\forward\11-1014 partial fnl clsr pin\partial final closure plan document\text\sec 2.doc <br />