My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2011_27
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2011_27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 8:38:02 PM
Creation date
7/3/2020 10:56:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2011_27
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2011_27.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
494
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L. The minimum compaction for all fill materials placed is specified as 90 percent of the <br />maximum dry density as determined by ASTM D 1557 and the specified moisture content is <br />2% above or below optimum moisture content as determined by ASTM D1557. <br />M. The maximum hydraulic conductivity of the fill materials is specified as 1.0x10-6 cm/sec as <br />determined by ASTM D5084 or modified USBR E 9600. <br />N. The Contractor shall selectively excavate soils from pre -approved off-site or on-site borrow <br />sources as identified by the Landfill Engineer and Geotechnical CQA Consultant (or his <br />representative) during the grading operations. The cover soils shall contain sufficient fine- <br />grained constituents such that gravel size and larger fragments do not cluster during <br />construction. All import soils shall be free of potentially hazardous environmental pollutants. <br />O. In the designated processing areas, cover soils shall be processed to obtain a uniform soil <br />condition. <br />P. Protective cover soils shall be moisture conditioned (or dried) as necessary to 2% above or <br />below optimum moisture content as determined by ASTM D1557. <br />Q. Neither material import nor cover production shall exceed the capability of the processing <br />operation to meet the project specifications. <br />R. Representative samples of fill materials will be tested in the laboratory in order to determine <br />the physical characteristics of the material. During processing and/or grading operations, no <br />soils or soil types other than those previously analyzed may be used, unless the Geotechnical <br />CQA Consultant. documents the suitability of these soils with appropriate additional testing <br />paid for by the Contractor. <br />S. Where tests indicate the moisture content, density, saturated hydraulic conductivity, and/or <br />other required soils characteristics of any fill or portion thereof is below the project <br />requirements, the particular layer or portion shall be retested and if necessary reworked <br />and/or removed and replaced until the required condition has been attained. No additional <br />fill shall be placed over an area until the last fill has been tested horizontally and vertically <br />and meets the requirements of this document to the satisfaction of the Geotechnical CQA <br />Consultant. <br />T. Where work is interrupted by heavy rains, fill operations shall not be resumed until <br />observations and field tests by the Geotechnical CQA Consultant indicate the moisture <br />content and density of the in-place fills and/or materials intended for placement are within the <br />limits previously specified in (P). <br />U. Drainage provisions shall be constructed in compliance with the recommendations of the <br />Design Engineer and as shown on the Project Drawings. <br />SM <br />GLA/2005.0082/FORWARD/CQAPLAN.dod9/ISaODS <br />Geologic Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.