Laserfiche WebLink
California and responsible for overseeing completion of qualityassurance earthwork observation <br />inspection and soil testing. <br />"Independent Testing Laboratory" - The firm responsible for conducting tests on soils samples. <br />"Landfill Engineer" - The firm responsible for design and preparation of the Project Drawings <br />and Specifications. All completed work is subject to approval by the Landfill Engineer. <br />"Owner" - The owner of the site, in this case, Allied Waste Industries, Inc. <br />"Proiect Documents" - All Contractor submittals, Construction Drawings, Record Drawings, <br />"As -Built" Plans, Construction Specifications, CQA Plan, Health and Safety Plan and Project <br />Schedule. <br />"Protect Mana ear" - Allied Waste's designated representative responsible for the project. <br />"Project Ihawings_Plans and -Specifications" - All project related Drawings and Specifications <br />including design modifications and Record Drawings. <br />"COA Officer" - The representative for the Geotechnical CQA Consultant who will be <br />responsible for overall review, observation, sampling and testing activities for construction. <br />"CQA Monitors" - The individuals working under the direction of the CQA Officer. Such <br />personnel include *Technicians", "Field Engineers" and "Field Geologists" representing the <br />Engineer and Geotechnical CQA Consultant. CQA Monitors responsible for the earthwork, shall <br />be experienced in landfill construction monitoring, soil construction and compaction testing <br />during grading operations. <br />"Work" - All tools, equipment, supervision, labor, and materials or supplies necessary to <br />complete the project as specified herein and as shown on the Project Drawings. <br />3.0 CQA ORGANIZATION <br />The CQA Team will consist of design and field personnel with specific experience in the <br />inspection and CQA monitoring of earthwork activities related to landfill alternative final cover <br />construction Figure t shows the CQA Project Organization Chart for the project with principal <br />fiinctions of the CQA team presented below: <br />® -3- <br />GeoL.ogic Associates <br />