My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2011_27
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2011_27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 8:38:02 PM
Creation date
7/3/2020 10:56:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2011_27
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2011_27.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
494
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® 7.0 DOCUMENTATION <br />To provide evidence of satisfactory work performance, all stages of alternative final cover <br />construction shall be documented. The information shall be recorded on a standardized form or <br />in a bound field logbook. <br />The purpose of daily record keeping is to record construction activities, including results of <br />continuous visual observations; laboratory/field test data; sampling; review of test results; <br />repairs; problems; solutions and general field activity. The CQA Monitor(s) shall keep a Daily <br />Field Inspection Report of project activities. At a minimum, this report shall include the <br />following: <br />• Date and project identification. <br />• Field activity and work locations. <br />• Summaries of field communications. <br />• Summary of equipment and personnel used. <br />• Work activity monitored, general location on-site and any related tests taken. <br />• Record of material sampling and testing activities. <br />• Any variance from specified methods and standards. <br />• Estimated quantities of material placed and compacted.. <br />® • Unusual events. <br />Actions regarding aomptance/rejeWon of work. <br />• Weather conditions. <br />• Signature of person preparing the report. <br />11 <br />The daily field inspection report shall be reviewed by the QA Manager and shall be submitted to <br />the Construction Manager. One complete set of both daily reports shall be kept on site by the <br />CQA personnel at all times. The contractor will be notified of the "pass/fail" nature of the CQA <br />results but will be provided with numerical data only at the discretion of the Construction <br />Manager. Release of the QA data to the Contractor would be for convenience only and would, in <br />no way, relieve the Contractor from sole responsibility for fulfilling the project requirements. <br />7.2 PHOTO DOCUMENTATION <br />The Construction Manager shall prepare a photographic record as part of the construction control <br />activities. Photographs shall be in color and shall include photographs of construction activities, <br />problem areas, corrective actions, and final constructed features. Photographs shall be identified <br />with the site designation, the date taken, the location, and a description of the activity covered by <br />the photograph. <br />As the work is completed, final Record Drawings and a report shall be prepared under the <br />direction of the Engineer and Construction Manager utilizing the record prepared during <br />WARWCQA" AN.d*elAt5=5 <br />Geot.ogic Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.