<br />REVIEW OF DESIGN REPORT, WASTE MANAGEMENT UNIT FU -13, FORWARD
<br />LANDFILL, SAN JOAQUIN COUNTY
<br />Central Valley Regional Water Board staff has reviewed the Design Report, Waste Management
<br />Unit FU -13, Forward Landfill, submitted on 29 April 2013. The report presents grading plans,
<br />slope stability calculations, surface drainage, containment system design, material
<br />specifications and construction quality assurance procedures for a new solid waste
<br />management unit (WMU) at Forward Landfill.
<br />The Design Report is in general compliance with Title 27, California Code of Regulations (Title
<br />27), Waste Discharge Requirements Order No. R5-2003-0049, and your facility's Joint
<br />Technical Document. The base liner system complies with Title 27 standards, the side slope
<br />and interface liners are previously approved engineered alternative designs. The following
<br />should be included in the final CQA report:
<br />1. The CQA report must contain sufficient information for RWQCB staff to determine
<br />that the unit was constructed in compliance with this Design Report, Title 27 and
<br />Waste Discharge Requirements.
<br />2. Contain As -Built Drawings of the major components including the leachate collection
<br />system, pipe layout, top of subgrade, tope of drainage gravel, top of operations layer,
<br />sump connections and a map showing locations of all CQQ testing.
<br />3. Copies of weekly construction reports should be FAXed to RWQCB staff each week.
<br />Daily, weekly and other construction reports and change orders should be
<br />documented in the final CQA Report.
<br />Staff finds that the design plans and specifications comply with Title 27, the facility's WDRs and
<br />we concur with the plan. If you have questions, please call me at (916) 464-4614.
<br />Ross Atkinson
<br />Engineering Geologist
<br />Title 27 Permitting and Mining Unit
<br />cc on following page.
<br />KARL E. LONGLEY SCD, P.E., CHAIR 1 PAMELA C. CREEDON. EXECUTIVE OFFICER
<br />11020 Sun Center Drive #200, Rancho Cordova, CA 95670 j www.waterboards.ca-gov/centralvalley
<br />C,, nECYCLCD —1—
<br />E, G, BRONJN JR.
<br />MATTHEw RODRIOuEZ
<br />SECRETARY FOR
<br />FNVIRDNMFNTAI PROTFC.TIDN
<br />9 May 2013
<br />,m
<br />Kevin Basso — General Manager
<br />Republic Services Inc. _
<br />1145 West Charger Way" :
<br />Stockton, CA 95260
<br />REVIEW OF DESIGN REPORT, WASTE MANAGEMENT UNIT FU -13, FORWARD
<br />LANDFILL, SAN JOAQUIN COUNTY
<br />Central Valley Regional Water Board staff has reviewed the Design Report, Waste Management
<br />Unit FU -13, Forward Landfill, submitted on 29 April 2013. The report presents grading plans,
<br />slope stability calculations, surface drainage, containment system design, material
<br />specifications and construction quality assurance procedures for a new solid waste
<br />management unit (WMU) at Forward Landfill.
<br />The Design Report is in general compliance with Title 27, California Code of Regulations (Title
<br />27), Waste Discharge Requirements Order No. R5-2003-0049, and your facility's Joint
<br />Technical Document. The base liner system complies with Title 27 standards, the side slope
<br />and interface liners are previously approved engineered alternative designs. The following
<br />should be included in the final CQA report:
<br />1. The CQA report must contain sufficient information for RWQCB staff to determine
<br />that the unit was constructed in compliance with this Design Report, Title 27 and
<br />Waste Discharge Requirements.
<br />2. Contain As -Built Drawings of the major components including the leachate collection
<br />system, pipe layout, top of subgrade, tope of drainage gravel, top of operations layer,
<br />sump connections and a map showing locations of all CQQ testing.
<br />3. Copies of weekly construction reports should be FAXed to RWQCB staff each week.
<br />Daily, weekly and other construction reports and change orders should be
<br />documented in the final CQA Report.
<br />Staff finds that the design plans and specifications comply with Title 27, the facility's WDRs and
<br />we concur with the plan. If you have questions, please call me at (916) 464-4614.
<br />Ross Atkinson
<br />Engineering Geologist
<br />Title 27 Permitting and Mining Unit
<br />cc on following page.