Laserfiche WebLink
Geo-Logk <br /> A S S O C I AT E S � <br /> Geologists,Hydrogeologists and Engineers q r1 201 <br /> EN�►RO M�TISER\j,r,E4 <br /> April 23, 2012 <br /> PER JN: 2012-0026 <br /> Mr. Ross Atkinson <br /> Central Valley Regional Water Quality Control Board <br /> 11020 Sun Center Drive, Suite 200 <br /> Rancho Cordova, CA 95670-6114 <br /> GROUNDWATER TREATMENT FACILITY MONITORING REPORT <br /> FIRST QUARTER 2012 <br /> FORWARD LANDFILL <br /> SAN JOA UIN, CALIFORNIA <br /> INTRODUCTION <br /> On behalf of Forward Inc. (Forward), Geo-Logic Associates(GLA) is submitting this <br /> summary report for the Forward Landfill groundwater treatment facility(GTF) to fulfill <br /> the requirements established by Waste Discharge Requirements (WDRs) Order No. R5- <br /> 2003-0080. <br /> The Forward Landfill is an active facility located at 9999 South Austin Road in Manteca, <br /> California. Following detection of volatile organic compounds (VOCs) in groundwater, a <br /> Corrective Action Program (CAP) was implemented at the site in 1994, which currently <br /> includes five groundwater extraction wells(EW-1, EW-2, EW-3, EW-313, and EW-4) <br /> that pump groundwater through an air stripper treatment system to remove VOCs. The <br /> treated groundwater is discharged to an infiltration pond north of the Austin Road Unit of <br /> the Forward Landfill. Included herein is a summary of the water quality monitoring <br /> results for the GTF at the Forward Landfill for the first quarter 2012. <br /> CAP MONITORING PROGRAM RESULTS <br /> Under WDR Order No. R5-2003-0080, effluent monitoring consists of monthly analysis <br /> of pH, specific conductance (EC), and VOCs; quarterly analysis for total dissolved solids <br /> (TDS); and annual analysis of 24 metals. In addition, influent is monitored semiannually <br /> for pH, EC,turbidity, and VOCs. Del-Tech Geotechnical Support Services (Del-Tech) <br /> performs the operation and maintenance (O&M) duties and performs bimonthly <br /> inspections for the Forward Landfill GTF. The results of the bimonthly inspections are <br /> presented below and summarized in Table 1. The field monitoring logs and laboratory <br /> results are attached. <br /> Oygrational Summary - As shown in Table 1, between December 13, 2011 and March 28, <br /> 2012, the CAP system treated approximately 26,004,700 gallons of groundwater at an <br /> average flow rate of 158 gallons per minute, or 228,098 gallons per day. During the <br /> 11415 W. Bernardo Court,Suite 200, San Diego, California 92127 Phone: (858)451-1136 FAX: (858)451-1087 <br />