DEL-TECH GEOTECHNICAL SUPPORT SERVICES,INC.
<br /> (209)847-8757 (OFFICE) - (209)847-3700 (FAX) r deltechl@pacbefl.net pacbell.net (Email)
<br /> SITE: FORWARD LANDFILL/FRESNO,CA.
<br /> GROUNDWATER TREATMENT SYSTEM MONITORING LOG 2013
<br /> EXTRACTION SYSTEM MEASUREMENTS @ AIR STRIPPER
<br /> INFLUENT METER EW-1 SAMPLE TOWER DAYS TOTAL TOTAL NOTES
<br /> READINGS ON OPERATION POINT TOTALIZER I Between I Gallons Gallons
<br /> DATE STATUS Readings Pumped Per Day
<br /> GALLONS
<br /> January 8,2013 NO N 54,242,100 11 1,307,500 118,864
<br /> January22,2013 57,283,400 14 3,041,300 217,236
<br /> Max
<br /> February 11,2013 NO 60,993,400 20 3,710,000 185,500
<br /> February 28,2013 NO 66,122,900 17 5,129,500 301,735
<br /> March 11,2013 NO 69,083,200 11 1 2,960,300 269,118
<br /> March 29,2013 NO NO- 75,102,300 18 6,019,100 334,394
<br /> April 19,2013 NO 80,325,000 21 5,222,700 248,700
<br /> April 29,2013 NO NO 83,244,700 20 2,919,700 145,985
<br /> May 13,2013 NO NO 85,299,175 15 2,054,475 136,965
<br /> May 28,2013 NO 87,216,700 15 1,917,525 127,835
<br /> June 14,2013 NO NO; 91,816,900 17 4,600,200 270,600
<br /> June 27,2013 94,286,400 13 2,469,500 189,962
<br /> July 9,2013 NO 97,579,900 12 3,293,500 274,458
<br /> July 23,2013 N 1,386,000 14 3,806,100 271,864
<br /> NOTE: THIS SYSTEM IS RUNNING CONTINUOUSLY ON EW-1 ONLY AND HAS A POOR RECHARGE. SYSTEM CYCLES CONSTANTLY.
<br /> TOTAL GALLONS PUMPED FOR THE YEAR 2013 = -
<br /> 1,000,000
<br /> N O O T M t%,
<br /> f` V1 M N % 'a kn tn
<br /> N N TI,
<br /> V7
<br /> 00 .moi Nf N !
<br /> 100,000
<br /> 1
<br /> i
<br /> I
<br /> i
<br /> 10,000
<br /> \4' \`lti \til 41
<br /> � \�1 b h\`ti� \tia
<br /> AVERAGE GALLONS PUMPED PER DAY IN TIMED INTERVALS FOR
<br /> EACH BI-MONTHLY MONITORING FOR 2013
<br />
|