Laserfiche WebLink
Project Name ry2 q-R0 '-tt-L <br /> le Inspector's Name SU ML KI SgfJAV) JALUE <br /> Unit Tested WNV - - ` ENGINEERING <br /> Date <br /> ANNUAL LCRS CONTINUITY TEST INSPECTION <br /> (C)TRACER DYE DETECTION MONITORING LOG <br /> Pump start time: 1515- Approximate pump flow rate: ^- /0?Om <br /> Does the pump reading indicate continuous flow? Yes-)(—No �� <br /> Time Flow Rate(atom) Tracer Dye Detected(Y/N) <br /> Jo <br /> jF <br /> Was tracer dye detected from the LCRS sump? Yes No <br /> If Yes,state approximate migration time to detection- -� hyo_ <br /> If No,state possible reason HA <br /> Remedial Action Work Order Date Completed Signature <br /> Signature of Inspector <br /> ® ! e <br /> Page 2 of 2 <br />