My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 7:46:10 AM
Creation date
7/3/2020 10:57:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_2
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX A <br /> KLEINP=ER FIELD ACTIMES PROTOCOL <br /> The Sampling and Analysis Plan (Kleinfelder, Novemberl, 1994) describes Ixoar Forward, Inc. <br /> conducts groundwater motutoring for WMU A. The infpntiatioA contained in the Plan <br /> suPercedes sections related to sampling <br /> and analysis in the April 1989 Postcl' Plea, <br /> Addendum #I and Addendum #2. The `on of groundwater, sampling methods and <br /> Procedures discussed in this appendix,Meinfelder Field Activities Protocol,arc an ex t <br /> more comprehensive S ccrp of the <br /> . Sampling and Analysis Plan. _ <br /> GROUND WATER MONITORING <br /> Monitoring Wells <br /> Equipment <br /> The groundwater monitoring vis at Forward are equipped with dedicated submerged Pumps for <br /> Pig and collection groundwater samples_- The field tccWc 1W perming the $mu:idwater,- <br /> -` monitoring will have a list of <br /> equipment nt that-should be available with-whicj, to complete.the <br /> monitoring. The necessary equipment is fisted below. This list includes actual equipment used <br /> to purge and sample the wells in addition tonal r dternvc <br /> Pew P gear that must be worn for- <br /> protection and to reduce the potential for cross co `ort of the wells and=unpl,= Some of <br /> the egirlpment used includes various insnrurriwhich require calibration. Calibration <br /> procedures are discussed below.- <br /> Calibration Procedures - <br /> Many of the ureters that are used in the field must be calibrated to produce rrllable results. The <br /> following discusses calibration rationale,procedures,and ea for the: . <br /> c3' * iastxwneuts <br /> at .evel Indicatot <br /> Water level indicators .roust be calibrated regularly to a=ire that data is not being measured - <br /> incprrectlydue to the cable stretching. To catx'brate thewater levet indicator the cable is nm out <br /> to its entire length and measured against a tape meas=. The 0 point is the point on the probe <br /> which completes the circuit when contacted by the water. This completed circu It causes the ! <br /> 23-483849401LZ32QR32S A-1 <br /> July 14,2000 <br /> C�ap76&2M xklaw4a.lw- . <br />
The URL can be used to link to this page
Your browser does not support the video tag.