Laserfiche WebLink
• <br />Geo-LoqkA550CIATEs <br />CQA DAILY SUMMARY REPORT #012 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />Location: Manteca, CA Owner: Republic Services <br />CQA Consultant: Geologic Associates Contractors: Guinn Construction <br />Prepared by: Jose Armenta (GLA) Comanco Environmental Corp. <br />Submitted to: Scott Purdy (GLA) <br />Project #: 2013-AO55 <br />Report No.: 012 Report Date: Monday June 03, 2013 Onsite: 06:00 - 16:30 Hrs <br />Weather: AM: 63 OF Clear PM: 93°F Clear <br />Guinn Construction Activities: <br />• The Contractor continued FU13 floor excavation, continued excavation of LCRS trenches on subgrade; the <br />excavated material was transferred to stockpile located south of the Unit. <br />• The Contractor performed grading work on the west and north slopes with a motor grader and two (2) D6 <br />Cat dozer; performed clearing work along the west side of the 2:1 slope. <br />• • The Contractor performed continuous moisture conditioning of haul roads and adjacent areas for dust <br />control. <br />Personnel: (1) Superintendent, (1) Grade Checker, (3) Operators, (2) Laborers. <br />Equipment: (1) 825 Cat Sheepsfoot compactor, (1) 140H Cat Motor -Grader, (2) Water trucks, (1) Cat Excavator, <br />(3) D6 Cat Dozers, (5) 637 Cat Scrapers, (1) Cat Fork-lift. <br />CQA (GLA) Activities: Field Personnel (1) <br />• CQA personnel performed continuous monitoring of all construction activities insuring conformance with the <br />project specifications. <br />Meetings and Site Discussions: <br />• Met with Kevin Turner (Guinn Superintendent) in the morning to discuss planned activity for the work shift. <br />The Contractor would continue slope finishing work. The Contractor would continue excavation of the LCRS <br />trenches on subgrade. <br />0 Site Visitors: <br />None <br />s: s <br />