Laserfiche WebLink
Geo -Logic <br />A S S O C I AT E S <br />CQA DAILY SUMMARY REPORT #014 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />Met with Kevin Turner (Guinn Superintendent) in the morning to discuss planned activity for the work shift. <br />The Contractor would continue slope finishing work. The Contractor would continue excavation of the LCRS <br />trenches on subgrade. The Contractor would perform grading work along the North tie-in. <br />Site Visitors: <br />• None <br />Photos: <br />Fig.1 Looking east on FU 13, subgrade work in area between the 68 contour and the tie-in on the north <br />slope. <br />• <br />C7 <br />